Skip to content

GERC · Gujarat Electricity Regulatory Commission

Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (First Amendment) Regulations, 2017

Draft amendmentDated 13 Jun 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's first amendment to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. It is a short amending instrument made under sections 61, 86 and 181 of the Electricity Act 2003, extends to the whole of Gujarat and takes effect from the date of publication in the Official Gazette (p1). The notification number is left blank on the face of the document (p1).

The substantive change is to the eligibility cap for rooftop solar. A new third proviso to Regulation 6.2 makes residential consumers eligible to install rooftop capacity "irrespective of whatever is their sanctioned load" (p2), and Clause 1.3 of the Annexure-IV Net Metering Interconnection Agreement is rewritten to match: non-residential consumers must keep rooftop capacity within 50% of contract load/demand/sanctioned load for the first two years of the connection agreement, while residential consumers are free of that cap (p3).

A third amendment touches Regulation 7, the activity/sub-activity timeline table. The instrument is signed by the Commission's Secretary at Gandhinagar on 13 June 2017 (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document