GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016
Draft regulationDated 31 Jan 2016Notification No. ___/2016 dated February 2016
Draft
A proposal that has since been finalised as the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's February 2016 draft of the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 (p1, p3). Made under ss 61, 66, 86(1)(e) and 181 of the Electricity Act 2003, it is intended to apply to distribution licensees and their consumers in Gujarat who install grid-connected rooftop solar PV under net metering, including systems owned by third parties (p3, p8). It would come into force on notification in the Official Gazette (p3).
The regulations define key terms, including eligible consumer, net metering, net meter, APPC, third-party owner and renewable energy systems (p3–7). They set scope and general principles: net metering is to be offered non-discriminatorily and first come first served (p8–9). Capacity rules cap cumulative rooftop PV at a distribution transformer and set individual eligibility and project size limits (p9–11). Regulations 7–8 prescribe the application, feasibility, approval, interconnection-agreement and safety/technical process, including CEA connectivity and safety standards, anti-islanding, protection settings and commissioning by GEDA/CEI (p11–18).
Regulations 9–16 cover energy accounting and settlement by consumer category, APPC purchase of surplus, banking within a billing cycle, 15-minute accounting for certain consumers, RPO/REC treatment, exemptions from transmission/wheeling/cross-subsidy/additional surcharge, metering, CDM benefit sharing, demand cut and penalty/compensation (p18–24). Regulations 17–20 give the Commission powers to direct, relax, amend and remove difficulties (p24–25).
Annexures provide abbreviations, application form, connectivity charges, a model net-metering interconnection agreement, inverter/harmonics and technical interconnection standards, an interconnection schematic, net-metering configuration options and meter specifications (p26–48).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.