GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Second Amendment) Regulations, 2019
Draft amendmentDated 18 Dec 2019
Draft
A proposal that has since been finalised as the Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's draft Second Amendment to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. It extends to the whole State and takes effect from Gazette publication; the draft is dated 18/12/2019 and carries a blank notification number (p1, p14).
It first inserts a new definition of "MSME (Manufacturing) Enterprise" into Regulation 2.1, tied to registration and investment thresholds under the MSMED Act, 2006 (p2). Regulation 5 gains a proviso capping the cumulative net-metering capacity permitted at a distribution transformer (p3). Regulation 6.2 is rewritten so that residential consumers and MSME (Manufacturing) enterprises may size their rooftop system irrespective of sanctioned load, while every other category is capped relative to sanctioned load/contract demand (p3–4). References to GEDA are broadened to include an agency designated by the Government of Gujarat (p4).
The heart of the amendment replaces Regulation 9 on energy accounting and settlement with a category-by-category framework (p4–9): separate treatment for residential and government consumers; industrial, commercial and other consumers using the energy attribute but not registered under REC; MSME (Manufacturing) enterprises, with time-block accounting and a carve-back to the industrial rule where installation stays within half of contracted demand; consumers using the renewable attribute for RPO; and those using it for REC. Each stream settles how surplus injection is compensated, how banking within a billing cycle operates, how peak charges apply, and how credit balances at financial year end are paid or carried forward.
It replaces the metering clause 13.5 — accuracy class, check-meter thresholds, testing, sealing, time-of-day capability and who bears cost (p9–10) — deletes the two-meter configuration diagrams (p10), and amends the Annexure IV interconnection-agreement clauses governing surplus-power compensation and the capacity ceiling (p10–14).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.