Skip to content

GERC · Gujarat Electricity Regulatory Commission

Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Second Amendment) Regulations, 2019

Draft amendmentDated 18 Dec 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's draft Second Amendment to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. It extends to the whole State and takes effect from Gazette publication; the draft is dated 18/12/2019 and carries a blank notification number (p1, p14).

It first inserts a new definition of "MSME (Manufacturing) Enterprise" into Regulation 2.1, tied to registration and investment thresholds under the MSMED Act, 2006 (p2). Regulation 5 gains a proviso capping the cumulative net-metering capacity permitted at a distribution transformer (p3). Regulation 6.2 is rewritten so that residential consumers and MSME (Manufacturing) enterprises may size their rooftop system irrespective of sanctioned load, while every other category is capped relative to sanctioned load/contract demand (p3–4). References to GEDA are broadened to include an agency designated by the Government of Gujarat (p4).

The heart of the amendment replaces Regulation 9 on energy accounting and settlement with a category-by-category framework (p4–9): separate treatment for residential and government consumers; industrial, commercial and other consumers using the energy attribute but not registered under REC; MSME (Manufacturing) enterprises, with time-block accounting and a carve-back to the industrial rule where installation stays within half of contracted demand; consumers using the renewable attribute for RPO; and those using it for REC. Each stream settles how surplus injection is compensated, how banking within a billing cycle operates, how peak charges apply, and how credit balances at financial year end are paid or carried forward.

It replaces the metering clause 13.5 — accuracy class, check-meter thresholds, testing, sealing, time-of-day capability and who bears cost (p9–10) — deletes the two-meter configuration diagrams (p10), and amends the Annexure IV interconnection-agreement clauses governing surplus-power compensation and the capacity ceiling (p10–14).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy banking, Metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document