Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft

Explanatory Memorandum

Explanatory memorandum to a draftDated 14 Oct 2025

Explanatory memorandum to the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory memorandum accompanying the draft Fifth Amendment to the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016. It opens (p1) by reciting the principal regulations and the four earlier amendments — 2017, 2020, 2022 and 2024 — and identifies the two provisions it proposes to change: the activity chart under Regulation 7 and the connectivity levels under Regulation 8(2).

The first change responds to Petition No. 2475 of 2025, filed by four state-owned DISCOMs, and to an MNRE letter of 31.12.2024 asking for a simplified net metering process. The memorandum reproduces a proposed third proviso to Regulation 7 (p1–2) under which no separate written connectivity agreement would be executed for rooftop systems installed under PM Surya Ghar Muft Bijli Yojana; the consumer would be deemed bound by the regulations, the agreement would be deemed to commence on the date of commissioning, and the DISCOM would instead issue a written communication under proper receipt stating that date and the applicable surplus energy purchase rate.

The second change (p2–3) proposes replacing the existing Regulation 8(2) connectivity-level table with a cross-reference to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 and its amendments, so that rooftop connectivity levels track the Supply Code. The memorandum explains that the Supply Code was amended on 23.09.2024 to permit LT connectivity up to 100 kVA/kW of contracted demand, or up to 150 kVA/kW where the applicant opts for it, and that Regulation 8(2) must be aligned. The document closes (p3) with the proposed replacement text for Regulation 8(2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.