Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft

Gujarat Electricity Regulatory Commission (Net Metering RooMop Solar PV Grid Interac=ve Systems) (FiMh Amendment) Regula=ons, 2025

Draft amendmentDated 14 Oct 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's draft Fifth Amendment to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, signed by the Secretary at Gandhinagar on 14 October 2025 (p1–2). It extends to the whole of Gujarat and takes effect from publication in the Official Gazette, the date of which is not printed (p1). It makes two changes to the Principal Regulations.

First, it inserts a new proviso below the Activity Chart in Regulation 7, as read with the Fourth Amendment Regulations, 2024. Consumers who install solar rooftop PV under PM Surya Ghar Muft Bijli Yojana will not need a separate written connectivity agreement with the distribution licensee: they are deemed bound by the Regulations, the agreement is deemed to commence on the date of commissioning, and the discom must instead write to the applicant confirming the commencement date and the applicable rate at which surplus energy will be purchased (p1–2).

Second, it substitutes Regulation 8(2), so that the voltage level at which a rooftop PV system connects to the grid is the supply voltage level set by the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 as amended from time to time, replacing the Principal Regulations' own connectivity-level provision (p2). The notification number and file number are left blank (p1).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document