GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (First Amendment) Regulations, 2017
Statement of reasonsDated 5 Oct 2017
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for the Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (First Amendment) Regulations, 2017, signed at Gandhinagar on 6/10/2017 (p23). It is not itself the regulation: it records why the Commission amended its 2016 principal regulations and reproduces the amended wording.
Pages 1–4 give the background. The 2016 Net Metering Rooftop Solar PV Regulations (Notification No. 5/2016) capped installed capacity at 50% of contract demand/sanctioned load, within a 1 kW to 1 MW band and a ±5% tolerance (p2). The Energy & Petrochemicals Department and GUVNL asked GERC to align with the Gujarat Solar Power Policy 2015 as amended by G.R. No. SLR/11/2015/401/B dated 13.04.2017, which removed the 50% cap for residential consumers (p2–3).
Pages 4–5 record the process: draft amendment Regulations 2017 framed under ss.61, 86 and 181 of the Electricity Act 2003, public notices of 14–15.06.2017, publication on the Commission's website under the previous-publication procedure order, comments invited, and a public hearing on 7.07.2017.
Pages 5–23 are the substance — nine issues raised by objectors with the Commission's analysis. Only the first was accepted: the capacity ceiling is removed for residential consumers while it is retained for every other eligible consumer, effected through Regulation 6.2 (first paragraph), the first bullet of Sub-Activity (3) of Regulation 7, and Clause 1.3 of the Annexure-IV interconnection agreement (p5–10). Everything else — GEDA's fast-track timelines and waiver of its inspection/commissioning certificate, transformer capacity and peak-demand clarifications, deletion of the second line of protection, RPO and 15-minute energy accounting, solar meter class and capacity specifications, third-party ownership models, and exemptions from transmission, wheeling, cross-subsidy and additional surcharge — was rejected as beyond the scope of the draft amendment and left for a fresh consultation (p10–23).
Pages 24–25 are annexures listing the objectors and those who attended the hearing; the body calls them Annexure A and Annexure B, but the annexures are headed Annexure–I and Annexure–II.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.