GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
GERC (Net Metering Rooftop Solar PV Grid Interactive Systems (Fourth Amendment) Regulations, 2024.
Statement of reasonsDated 4 Sep 2024
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the Fourth Amendment to its Net Metering Rooftop Solar PV Grid Interactive Systems Regulations — the reasoning record that accompanies the finalised amendment, not the notified regulation itself. It reviews every objection received, records the Commission's findings, and directs gazette publication of the amended text.
The background (pp1–3) explains that the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 were amended in 2024, and reproduces the amended Rule 11: a fifteen-day technical feasibility study with deemed feasibility if no response; deemed acceptance without feasibility study for rooftop applications up to 10 kW; who bears the cost of upgrading distribution infrastructure; fifteen days from installation certificate to connection agreement, meter and commissioning; and publication of agreement and certificate formats on the licensee's web portal. The consultation record (pp3–4) covers the public notice of 20.05.2024, the hearing of 06.06.2024, and two annexures naming objectors.
The bulk of the document (pp4–24) concerns the substituted Regulation 5.1 — system strengthening charges. It sets out how distribution transformer capacity data is reported, when strengthening cost sits in a licensee's Annual Revenue Requirement instead of being charged to the applicant, and how charges above the small-consumer threshold are levied on a per kW (LT) or per kVA (HT) basis for state-owned discoms and Torrent Power while other private licensees recover on actual cost. Objections that the charges duplicate connection charges, that solar injection does not load the network, or that charges should apply only where strengthening work is actually needed are each answered and rejected.
The Regulation 7 discussion (pp24–35) sets the substituted timeline table governing registration, approval, feasibility report, agreement, network strengthening, commissioning and GEDA certification, and adds a compensation proviso where the licensee delays without just cause. The "No Legal Dispute Pending" item in the field feasibility report is deleted. Suggestions outside the draft (capacity limit changes, AC/DC clarity, alignment with green open access regulations) are not considered because no comments were invited on them (pp36–37). Annexures I and II list objectors and hearing attendees (pp38–39).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.