Draft Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

Gujarat Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026

Draft regulationDated 15 May 2026Notification No. …. of 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, issued for the whole State of Gujarat (p1). It creates a single framework for distributed renewable generation connected to the distribution network at 33 kV and below (p2), replacing the 2016 net-metering rooftop solar regulations (p1). It is made under sections 42, 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003, and is to come into force from the date of Gazette notification; the Gazette date is not printed (p1). The document is in draft form with a blank notification number, signed at Gandhinagar on 15/05/2026 (p1, p43).

Chapters 1–3 (p1–6) set short title, commencement, extent, repeal, definitions and scope. They define the five metering arrangements — net metering, net billing, gross metering, group net metering and virtual net metering — plus DRES, prosumer, participating consumer, RESCO, BESS and associated metering terms (p1–5). Chapter 4 (p6–11) lays down general conditions: non-discriminatory treatment, eligibility of all consumer categories, capacity bands for each metering arrangement, restrictions where arrears are pending, treatment of RESCO/third-party ownership, and the BESS obligation where DRES capacity exceeds contract demand (p6–9).

Chapters 5–7 (p9–16) prescribe the application and approval process. They provide for application forms, non-refundable fees, technical feasibility analysis, deemed acceptance for small DRES, system-strengthening cost recovery, distribution licensee obligations to prepare detailed procedures and a web portal within three months, an approved energy-accounting software procedure within five months, and a timed activity table from GEDA registration through CEI approval, technical feasibility, connectivity, metering and commissioning (p9–16). A compensation provision applies for unjustified licensee delay (p16).

Chapter 8 (p16–21) sets eligible consumer and DRES owner conditions and the minimum/maximum capacities for each arrangement, including the same-name/same-tariff requirements for group net metering, the same-distribution-licensee and allocation-ratio requirements for virtual net metering, and a summary table of capacities and eligible consumer categories (p21).

Chapter 9 (p21–31) is the commercial core: it specifies energy accounting and settlement for each arrangement. Net metering provides billing-period adjustment, with a cap on non-residential adjustment, banking charges, treatment of lapsed energy and a deemed-purchase rate for residential surplus (p22–23). Net billing uses a billing equation and values export at a generic RE tariff fixed at commissioning for the life of the DRES (p24–25). Gross metering sells the entire generation to the distribution licensee and allows carry-forward credits (p25–26). Group net metering and virtual net metering allocate injected energy to participating consumers using an allocation ratio on a 15-minute time-block basis, with banking, same-cycle adjustment, lapsed-energy and residential treatments (p26–31). ToD rules differentiate peak and off-peak adjustment (p23, p28, p30).

Chapters 10–15 (p31–42) cover open access charges — wheeling, banking, CSS and AS, with captive and residential exemptions/concessions — interconnection standards and safety, metering infrastructure, meter defect/failure accounting, RPO treatment, and restrictions (single metering arrangement, no simultaneous VNM and green energy open access, conversion of solar rooftop to hybrid, unauthorized capacity, wind turbine cap, FIFO settlement, BESS and hybrid metering) (p31–42).

Chapters 16–24 (p42–43) deal with communication/RTU and remote monitoring, possible peer-to-peer transactions under future regulations, dispute resolution before CGRF/Ombudsman or the Commission, carbon-credit sharing, and the Commission’s powers to issue directions, relax, amend and remove difficulties.

Annexures (p44–119) carry connectivity charges, model application forms for net/net-billing/gross, group net metering and virtual net metering, a model interconnection agreement for consumer-side DRES, and two model VNM agreements — one for captive/consumer group and one for RESCO/third-party ownership — with appendices for technical details, allocation ratios, lead-consumer authorization and documents.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Gross metering

Read with this

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.