This is the draft GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, issued for the whole State of Gujarat (p1). It creates a single framework for distributed renewable generation connected to the distribution network at 33 kV and below (p2), replacing the 2016 net-metering rooftop solar regulations (p1). It is made under sections 42, 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003, and is to come into force from the date of Gazette notification; the Gazette date is not printed (p1). The document is in draft form with a blank notification number, signed at Gandhinagar on 15/05/2026 (p1, p43).
Chapters 1–3 (p1–6) set short title, commencement, extent, repeal, definitions and scope. They define the five metering arrangements — net metering, net billing, gross metering, group net metering and virtual net metering — plus DRES, prosumer, participating consumer, RESCO, BESS and associated metering terms (p1–5). Chapter 4 (p6–11) lays down general conditions: non-discriminatory treatment, eligibility of all consumer categories, capacity bands for each metering arrangement, restrictions where arrears are pending, treatment of RESCO/third-party ownership, and the BESS obligation where DRES capacity exceeds contract demand (p6–9).
Chapters 5–7 (p9–16) prescribe the application and approval process. They provide for application forms, non-refundable fees, technical feasibility analysis, deemed acceptance for small DRES, system-strengthening cost recovery, distribution licensee obligations to prepare detailed procedures and a web portal within three months, an approved energy-accounting software procedure within five months, and a timed activity table from GEDA registration through CEI approval, technical feasibility, connectivity, metering and commissioning (p9–16). A compensation provision applies for unjustified licensee delay (p16).
Chapter 8 (p16–21) sets eligible consumer and DRES owner conditions and the minimum/maximum capacities for each arrangement, including the same-name/same-tariff requirements for group net metering, the same-distribution-licensee and allocation-ratio requirements for virtual net metering, and a summary table of capacities and eligible consumer categories (p21).
Chapter 9 (p21–31) is the commercial core: it specifies energy accounting and settlement for each arrangement. Net metering provides billing-period adjustment, with a cap on non-residential adjustment, banking charges, treatment of lapsed energy and a deemed-purchase rate for residential surplus (p22–23). Net billing uses a billing equation and values export at a generic RE tariff fixed at commissioning for the life of the DRES (p24–25). Gross metering sells the entire generation to the distribution licensee and allows carry-forward credits (p25–26). Group net metering and virtual net metering allocate injected energy to participating consumers using an allocation ratio on a 15-minute time-block basis, with banking, same-cycle adjustment, lapsed-energy and residential treatments (p26–31). ToD rules differentiate peak and off-peak adjustment (p23, p28, p30).
Chapters 10–15 (p31–42) cover open access charges — wheeling, banking, CSS and AS, with captive and residential exemptions/concessions — interconnection standards and safety, metering infrastructure, meter defect/failure accounting, RPO treatment, and restrictions (single metering arrangement, no simultaneous VNM and green energy open access, conversion of solar rooftop to hybrid, unauthorized capacity, wind turbine cap, FIFO settlement, BESS and hybrid metering) (p31–42).
Chapters 16–24 (p42–43) deal with communication/RTU and remote monitoring, possible peer-to-peer transactions under future regulations, dispute resolution before CGRF/Ombudsman or the Commission, carbon-credit sharing, and the Commission’s powers to issue directions, relax, amend and remove difficulties.
Annexures (p44–119) carry connectivity charges, model application forms for net/net-billing/gross, group net metering and virtual net metering, a model interconnection agreement for consumer-side DRES, and two model VNM agreements — one for captive/consumer group and one for RESCO/third-party ownership — with appendices for technical details, allocation ratios, lead-consumer authorization and documents.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.