Skip to content

GERC · Gujarat Electricity Regulatory Commission

Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016

RegulationDated 18 Jun 2016Notification No. 5/2016 dated 18/06/2016

Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's principal net-metering regulation for grid-connected rooftop solar, issued as Notification No. 5/2016 dated 18/06/2016 under ss.61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p3). It applies to distribution licensees and their consumers in Gujarat, including consumers receiving supply from their own generating source within a licensee's area (p8).

Regulation 2 defines key terms: eligible consumer, net metering, net meter, average power purchase cost, obligated entity, rooftop solar PV system, renewable energy certificate, interconnection point and related concepts (p3–7). Regulations 3–6 set scope and eligibility: self-owned rooftop PV must be within the consumer's premises, the distribution licensee must offer net metering non-discriminatorily on a first-come-first-served basis, cumulative transformer-level capacity is capped, and individual project capacity is bounded by a minimum and a maximum, including a percentage of sanctioned load (p8–10).

Regulation 7 lays out the application and approval workflow, with timeframes for GEDA registration, Chief Electrical Inspector approval, distribution licensee technical feasibility, connectivity agreement, meter installation and commissioning (p11–14). Regulation 8 specifies interconnection, safety, protection, anti-islanding, synchronization, isolation and commissioning requirements, cross-referring CEA and GERC instruments (p14–20).

Regulation 9 provides energy accounting and settlement for residential/government consumers and industrial/commercial consumers, distinguishing whether the consumer uses the energy attribute, renewable attribute for RPO, or REC mechanism; it covers banking, APPC-based purchase of surplus and 15-minute time-block accounting for specified categories (p20–23). Regulations 10–12 deal with dispute resolution, solar RPO treatment and exemption from transmission, wheeling, cross-subsidy and additional surcharges (p23–24). Regulations 13–16 cover metering, CDM benefit sharing, demand cut and penalty/compensation (p24–26). Regulations 17–20 contain the Commission's powers to direct, relax, amend and remove difficulties (p25–27). Annexures provide abbreviations, the application form, connectivity charges, a model interconnection agreement, inverter/harmonics/technical standards and meter specifications (p28–50).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy accounting and settlement, Metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document