GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016
RegulationDated 18 Jun 2016Notification No. 5/2016 dated 18/06/2016
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's principal net-metering regulation for grid-connected rooftop solar, issued as Notification No. 5/2016 dated 18/06/2016 under ss.61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p3). It applies to distribution licensees and their consumers in Gujarat, including consumers receiving supply from their own generating source within a licensee's area (p8).
Regulation 2 defines key terms: eligible consumer, net metering, net meter, average power purchase cost, obligated entity, rooftop solar PV system, renewable energy certificate, interconnection point and related concepts (p3–7). Regulations 3–6 set scope and eligibility: self-owned rooftop PV must be within the consumer's premises, the distribution licensee must offer net metering non-discriminatorily on a first-come-first-served basis, cumulative transformer-level capacity is capped, and individual project capacity is bounded by a minimum and a maximum, including a percentage of sanctioned load (p8–10).
Regulation 7 lays out the application and approval workflow, with timeframes for GEDA registration, Chief Electrical Inspector approval, distribution licensee technical feasibility, connectivity agreement, meter installation and commissioning (p11–14). Regulation 8 specifies interconnection, safety, protection, anti-islanding, synchronization, isolation and commissioning requirements, cross-referring CEA and GERC instruments (p14–20).
Regulation 9 provides energy accounting and settlement for residential/government consumers and industrial/commercial consumers, distinguishing whether the consumer uses the energy attribute, renewable attribute for RPO, or REC mechanism; it covers banking, APPC-based purchase of surplus and 15-minute time-block accounting for specified categories (p20–23). Regulations 10–12 deal with dispute resolution, solar RPO treatment and exemption from transmission, wheeling, cross-subsidy and additional surcharges (p23–24). Regulations 13–16 cover metering, CDM benefit sharing, demand cut and penalty/compensation (p24–26). Regulations 17–20 contain the Commission's powers to direct, relax, amend and remove difficulties (p25–27). Annexures provide abbreviations, the application form, connectivity charges, a model interconnection agreement, inverter/harmonics/technical standards and meter specifications (p28–50).
Read with this
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.