Skip to content

GERC · Gujarat Electricity Regulatory Commission

Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024

Draft amendmentDated 18 May 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft fourth amendment to the Gujarat Electricity Regulatory Commission's 2016 net metering regulations for grid-interactive rooftop solar PV systems. It amends the principal regulations of 2016 and their subsequent amendments, extends to the whole of Gujarat, and is to commence on publication in the Official Gazette (p1); the gazette date is not printed, and the date on the draft is 18/05/2024 (p9).

Clause 3 replaces Regulation 5.1 (p1–2). It requires the distribution licensee to update, annually, the distribution transformer capacity available for net-metered rooftop solar connections and to report that information to the Commission. It then allocates the cost of strengthening distribution infrastructure: for rooftop systems up to 6 kW, including additions aggregating to 6 kW, the cost goes into the licensee's Annual Revenue Requirement; above 6 kW the licensee recovers system-strengthening charges from the applicant. The recovery basis differs by consumer class and licensee: LT consumers above 6 kW up to 100 kW pay per-kW charges mirroring new/additional LT load charges, with state-owned discoms and Torrent Power named; HT consumers above 6 kW up to 1000 kW pay per-kVA charges mirroring new/additional HT load charges for state-owned discoms, while for other licensees the cost of any required augmentation is borne by the consumer. Where the Commission approves per-kW or per-kVA charges for new or additional load, the same applies to system strengthening. Charges are limited to the additional capacity when an existing system is expanded. A minimum installed capacity of 1 kW is prescribed (p4).

Clause 4 substitutes Regulation 7 with a process timeline (p4–9). The table assigns durations to activities from registration with GEDA or its designated agency, approval from the Chief Electrical Inspector, application to the distribution licensee, technical feasibility report (TFR), post-TFR connectivity, signing the agreement, system strengthening, notice and cancellation for non-completion, meter installation, reporting, and issuance of the GEDA commissioning certificate. A proviso deems applications for systems up to 10 kW, complete in all respects, accepted without a technical feasibility study and requires any needed enhancement of the sanctioned load to be carried out by the licensee (p9).

Clause 5 substitutes Clause 8.1 of the Connectivity Agreement in Annexure IV so that cost recovery from the applicant for strengthening distribution infrastructure is governed by Regulation 5.1 (p9).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Connection and miscellaneous charges, New connections and load changes

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document