GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024.
AmendmentDated 4 Sep 2024Published in the Gazette 6 Sep 2024GERC/REG/Legal/13/2024 dated 04/09/2024
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment by the Gujarat Electricity Regulatory Commission to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. Published in the Gujarat Government Gazette on 6 September 2024 and signed 4 September 2024, it extends to Gujarat and comes into force on Gazette publication (p1, p5). It is made under ss. 61, 66 and 86(1)(e) read with s. 181 of the Electricity Act, 2003 (p1).
The operative changes are short. Clause 5.1 is substituted to require the distribution licensee to update distribution transformer capacity available for net-metering rooftop solar annually and report it to the Commission (p1). It then allocates infrastructure strengthening costs: strengthening needed to accommodate rooftop solar up to 6 kW is to be included in the licensee's Annual Revenue Requirement; for aggregate capacity above 6 kW, system strengthening charges are recovered from the applicant (p1–2). For LT consumers above 6 kW up to 100 kW, and HT consumers above 6 kW up to 1000 kW, the cost is recovered at per-kW/per-kVA rates applicable to new or additional load as approved by the Commission, with separate treatment for state-owned discoms/Torrent Power Limited and other discoms/licensees; where only infrastructure augmentation is needed for other licensees, the consumer bears it (p2). Minimum rooftop solar capacity is 1 kW (p2).
Regulation 7 is substituted with a mandatory activity timeline covering registration, approvals, application to the distribution licensee, technical feasibility report (TFR), post-TFR estimate, connectivity agreement, system strengthening, commissioning and related steps (p2–5). Clause 8.1 of the Connectivity Agreement at Annexure IV is substituted to make cost recovery for strengthening follow Regulation 5.1 (p5).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.