Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024.

AmendmentDated 4 Sep 2024Published in the Gazette 6 Sep 2024GERC/REG/Legal/13/2024 dated 04/09/2024

Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment by the Gujarat Electricity Regulatory Commission to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. Published in the Gujarat Government Gazette on 6 September 2024 and signed 4 September 2024, it extends to Gujarat and comes into force on Gazette publication (p1, p5). It is made under ss. 61, 66 and 86(1)(e) read with s. 181 of the Electricity Act, 2003 (p1).

The operative changes are short. Clause 5.1 is substituted to require the distribution licensee to update distribution transformer capacity available for net-metering rooftop solar annually and report it to the Commission (p1). It then allocates infrastructure strengthening costs: strengthening needed to accommodate rooftop solar up to 6 kW is to be included in the licensee's Annual Revenue Requirement; for aggregate capacity above 6 kW, system strengthening charges are recovered from the applicant (p1–2). For LT consumers above 6 kW up to 100 kW, and HT consumers above 6 kW up to 1000 kW, the cost is recovered at per-kW/per-kVA rates applicable to new or additional load as approved by the Commission, with separate treatment for state-owned discoms/Torrent Power Limited and other discoms/licensees; where only infrastructure augmentation is needed for other licensees, the consumer bears it (p2). Minimum rooftop solar capacity is 1 kW (p2).

Regulation 7 is substituted with a mandatory activity timeline covering registration, approvals, application to the distribution licensee, technical feasibility report (TFR), post-TFR estimate, connectivity agreement, system strengthening, commissioning and related steps (p2–5). Clause 8.1 of the Connectivity Agreement at Annexure IV is substituted to make cost recovery for strengthening follow Regulation 5.1 (p5).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Connection and miscellaneous charges, Standards of performance

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.