GERC · Gujarat Electricity Regulatory Commission

Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons

GERC (Net Metering Rooftop Solar PV Grid Interactive Systems (Fifth Amendment) Regulations, 2025.

Statement of reasonsDated 4 Nov 2025

Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Statement of Reasons (SoR) issued by the Gujarat Electricity Regulatory Commission on 04/11/2025 (p5) to accompany the Fifth Amendment to its Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016. It explains why two provisions are being changed and directs that the amendment be published in the Official Gazette (p5).

Part 1 (pp1–4) traces the instrument's history — the 2016 principal regulations and the four amendments of 2017, 2020, 2022 and 2024 — and sets out two changes. First, following Petition No. 2475 of 2025 by four state-owned DISCOMs, which relied on an MNRE letter of 31.12.2024 seeking simplification under PM Surya Ghar Muft Bijli Yojana, a proviso is inserted in the activity chart under Regulation 7: no separate written connectivity agreement is required for rooftop systems installed under that scheme; the consumer is deemed bound by the Regulations, the agreement is deemed to commence on the date of commissioning, and the DISCOM must communicate that date and the applicable surplus-energy purchase rate (pp2–3). Second, Regulation 8(2) — which currently sets connectivity levels by connected load — is substituted by a reference to the connectivity levels in the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 as amended, to align with that Code's Fourth Amendment (notification dated 23.09.2024), which revised LT connectivity thresholds (pp3–4).

Part 2 (p4) records the consultation: public notice of 14.10.2025, publication in two Gujarati and one English newspaper, website posting, and circulation to the State Advisory Committee and Coordination Forum. Part 3 (p4) states that no comments were received and no stakeholder appeared at the public hearing of 28.10.2025, so the draft was finalised without modification. Part 4 (p5) directs gazette publication.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document