Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
GERC (Net Metering Rooftop Solar PV Grid Interactive Systems (Fifth Amendment) Regulations, 2025.
Statement of reasonsDated 4 Nov 2025
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Statement of Reasons (SoR) issued by the Gujarat Electricity Regulatory Commission on 04/11/2025 (p5) to accompany the Fifth Amendment to its Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016. It explains why two provisions are being changed and directs that the amendment be published in the Official Gazette (p5).
Part 1 (pp1–4) traces the instrument's history — the 2016 principal regulations and the four amendments of 2017, 2020, 2022 and 2024 — and sets out two changes. First, following Petition No. 2475 of 2025 by four state-owned DISCOMs, which relied on an MNRE letter of 31.12.2024 seeking simplification under PM Surya Ghar Muft Bijli Yojana, a proviso is inserted in the activity chart under Regulation 7: no separate written connectivity agreement is required for rooftop systems installed under that scheme; the consumer is deemed bound by the Regulations, the agreement is deemed to commence on the date of commissioning, and the DISCOM must communicate that date and the applicable surplus-energy purchase rate (pp2–3). Second, Regulation 8(2) — which currently sets connectivity levels by connected load — is substituted by a reference to the connectivity levels in the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 as amended, to align with that Code's Fourth Amendment (notification dated 23.09.2024), which revised LT connectivity thresholds (pp3–4).
Part 2 (p4) records the consultation: public notice of 14.10.2025, publication in two Gujarati and one English newspaper, website posting, and circulation to the State Advisory Committee and Coordination Forum. Part 3 (p4) states that no comments were received and no stakeholder appeared at the public hearing of 28.10.2025, so the draft was finalised without modification. Part 4 (p5) directs gazette publication.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.