Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations, 2022.

Statement of reasonsDated 31 May 2022

Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 34 of 78. Check the regulator's original before you rely on it.

Pages 1–2 set the background: GERC's 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations (Notification No. 5 of 2016, notified 18.06.2016), already amended in 2017 and 2020, were revisited after the Commission disposed of Petition No. 1936 of 2021, taking account of the Gujarat Solar Power Policy, 2021 and the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020. A draft notification was published on 29.06.2021, followed by newspaper notices and a public hearing on 14.09.2021.

The bulk of the document (pp2–34) is a clause-by-clause record of each proposed change — draft text, stakeholder comments, and the Commission's reasoned decision. Paragraph 2 rejects demands for a three-month gestation period and for grandfathering projects already registered with GEDA, holding that the amendment applies prospectively from Gazette publication (pp2–3). Paragraphs 3–6 deal with definitions: new definitions of "gross meter" and "gross metering", a substituted "net metering" definition drawn from the MoP Rules, and a new "third party" definition confined to generation and sale on the same premises (pp3–10).

Paragraphs 7–17 walk through scope and application, general principles, capacity targets, eligible consumer/prosumer and individual project capacity, ending in revised capacity bands that separate net metering from gross metering and category-wise permissions for residential, captive, third-party-sale, REC and RPO projects (pp10–23). Paragraph 18 covers interconnection standards, voltage and metering (pp23–24). Paragraph 19 settles banking charges category by category (pp24–29), and paragraphs 20 and 22 deal with energy accounting and settlement, incremental capacity and the interconnection agreement (pp29–34). Throughout, the Commission refuses suggestions that fall outside the published draft.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Metering

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document