GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations, 2022.
Statement of reasonsDated 31 May 2022
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.
Summary
Summary written by software, from pages 1 to 34 of 78. Check the regulator's original before you rely on it.
Pages 1–2 set the background: GERC's 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations (Notification No. 5 of 2016, notified 18.06.2016), already amended in 2017 and 2020, were revisited after the Commission disposed of Petition No. 1936 of 2021, taking account of the Gujarat Solar Power Policy, 2021 and the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020. A draft notification was published on 29.06.2021, followed by newspaper notices and a public hearing on 14.09.2021.
The bulk of the document (pp2–34) is a clause-by-clause record of each proposed change — draft text, stakeholder comments, and the Commission's reasoned decision. Paragraph 2 rejects demands for a three-month gestation period and for grandfathering projects already registered with GEDA, holding that the amendment applies prospectively from Gazette publication (pp2–3). Paragraphs 3–6 deal with definitions: new definitions of "gross meter" and "gross metering", a substituted "net metering" definition drawn from the MoP Rules, and a new "third party" definition confined to generation and sale on the same premises (pp3–10).
Paragraphs 7–17 walk through scope and application, general principles, capacity targets, eligible consumer/prosumer and individual project capacity, ending in revised capacity bands that separate net metering from gross metering and category-wise permissions for residential, captive, third-party-sale, REC and RPO projects (pp10–23). Paragraph 18 covers interconnection standards, voltage and metering (pp23–24). Paragraph 19 settles banking charges category by category (pp24–29), and paragraphs 20 and 22 deal with energy accounting and settlement, incremental capacity and the interconnection agreement (pp29–34). Throughout, the Commission refuses suggestions that fall outside the published draft.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.