HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018

The Himachal Pradesh Electricity Supply Code (Second Amendment) Regulations, 2018.

AmendmentDated 31 Jul 2018No. HPERC/Secy/151.- dated 31st July, 2018

Amends the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amending instrument to the Himachal Pradesh Electricity Supply Code, 2009, issued by HPERC on 31 July 2018 (p1). The preamble records that the Distribution Licensee (HPSEBL), the Parwanoo Industries Association and the Divisional Commissioner Shimla Division proposed changes to rationalise the Code, that a draft was gazetted on 2 February 2018 and advertised in two newspapers on 4 February 2018, and that the Supply Code Review Panel and public respondents were consulted before finalisation (p1).

The operative text is five regulations. Regulation 1 gives the short title and a split commencement: everything except regulation 3 runs from Gazette publication, while regulation 3 runs from 1 April 2019 (p1–2). Regulation 2 lengthens the connection time-limit entry in the table at para 3.9.1 and adds a further proviso allowing a designated authority of the distribution licensee to relax the prescribed time limits where delay is beyond the applicant's reasonable control (p2). Regulation 3 inserts two provisos into para 3.10 capping temporary revision of contract demand within a financial year and providing pro-rata treatment for part-year cases, plus a Note directing the licensee to issue field procedural instructions for implementation from 1 April 2019 (p2). Regulation 4 replaces the interest formula in para 5.7.3 on excess amounts with a fixed/simple-interest formulation on a daily basis (p3). Regulation 5 substitutes item (iii) of para 6.1.9, requiring the Assessing Officer to pass a speaking order within thirty days of personal hearing in unauthorised-use cases and to assess consumption per Annexure-A of the Code (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Theft and unauthorised use, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document