Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Electricity Supply Code Review Panel Reconstitution Notification, 2026

Notification Regarding Reconstitution of Electricity Supply Code Review Panel

OrderDated 3 Jul 2026No. HPERC/438-Supply Code.- dated 3rd July, 2026

Made under the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC has reconstituted its Electricity Supply Code Review Panel by a notification dated 3 July 2026, issued as No. HPERC/438-Supply Code (p1). It is expressly a partial modification of the Commission's earlier notification on the same subject, dated 13 February 2024, and is made under clause 1.3 of the Himachal Pradesh Electricity Regulatory Supply Code, 2009 (p1).

The operative part is a composition table running from p1 to p2. Seats are allocated by office rather than by named individual: the Chairman plus other seats go to the distribution licensee, the Convener and a member come from the Commission itself, and further places go to the STU, the Electrical Inspectorate, a generator, and domestic and industrial consumer representatives (p1–2).

Four numbered terms follow on p2. The Chairman holds office for a limited fixed term while other members serve ex officio until their organisation changes or replaces them; government and PSU officers draw TA/DA from their parent organisation; other members receive a per-meeting sitting fee plus TA/DA at State Grade-I rates; and a fallback order is set for chairing meetings when the Director (Operation), HPSEBL, and then the Director (Projects), HPPTCL, are unavailable (p2).

Standard name
Electricity Supply Code
Primary topics
Advisory committees, Consumer representation

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document