Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Electricity Supply Code Review Panel Reconstitution Notification, 2019

Notification Regarding Reconstitution of Electricity Supply Code Review Panel

OrderDated 13 Dec 2019HPERC-438-Supply Code dated 13.12.2019

Made under the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification of 13 December 2019 (No. HPERC-438-Supply Code) reconstitutes the Electricity Supply Code Review Panel. It is expressly a *partial modification* of the Commission's earlier Notification No. HPERC/438 (Supply Code) dated 22 March 2016, and is issued under clause 1.3 of the Himachal Pradesh Electricity Regulatory Supply Code, 2009 (p1). The panel is the standing forum in which the Commission, the distribution licensee, the transmission utility and consumer and generator groups review supply-code matters.

Pages 1–2 carry a table of members and the constituency each represents: the distribution licensee's Director (Operation) and Chief Engineer (Commercial), HPERC's Executive Director (Technical) as Convener, a General Manager (Projects) from HPPTCL (the STU), an HPPWD electrical circle representative, and named representatives of irrigation, domestic, bulk and industrial consumers, a generator association and an industry body (p1–2).

Three numbered paragraphs then set the panel's working terms: the Chairman holds office for a fixed term of two years while all other members serve by virtue of the position they hold in their organisation or consumer group, until changed or replaced by that body; government, PSU and government-instrumentality members draw TA/DA from their parent organisation; other members are paid a sitting fee per meeting plus TA/DA at the rates admissible to Grade-I State Government officers (p2). The notification is signed by order of the Commission over the Secretary's signature.

Standard name
Electricity Supply Code
Primary topics
Advisory committees, Consumer representation

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document