AmendmentDated 3 Dec 2018No. HPERC/438-Supply Code.- dated 03rd December, 2018
Amends the Himachal Pradesh Electricity Supply Code, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-clause amendment by the Himachal Pradesh Electricity Regulatory Commission to the Himachal Pradesh Electricity Supply Code, 2009. Notified at Shimla on 3 December 2018 (p1), it inserts sub-para 3.1.2.1 into para 3.1.2 of the Code (p2). The inserted provision stops the distribution licensee from refusing a new connection merely because the applicant cannot produce a No Objection Certificate from a statutory authority such as a Panchayat, Municipality or Town and Country Development Authority; the connection must instead be released against an undertaking permitting disconnection if the authority later orders it, and regularised only once the authority's sanction letter is produced (p2). The recitals record the draft was published in the Rajpatra on 2 February 2018, advertised on 4 February 2018 and referred to the Supply Code Review Panel; no comments were received on the NOC issue, though other issues drew stakeholder responses that were considered (p1).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.