Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018

the Himachal Pradesh Electricity Supply Code (Third Amendment) Regulations, 2018

AmendmentDated 3 Dec 2018No. HPERC/438-Supply Code.- dated 03rd December, 2018

Amends the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-clause amendment by the Himachal Pradesh Electricity Regulatory Commission to the Himachal Pradesh Electricity Supply Code, 2009. Notified at Shimla on 3 December 2018 (p1), it inserts sub-para 3.1.2.1 into para 3.1.2 of the Code (p2). The inserted provision stops the distribution licensee from refusing a new connection merely because the applicant cannot produce a No Objection Certificate from a statutory authority such as a Panchayat, Municipality or Town and Country Development Authority; the connection must instead be released against an undertaking permitting disconnection if the authority later orders it, and regularised only once the authority's sanction letter is produced (p2). The recitals record the draft was published in the Rajpatra on 2 February 2018, advertised on 4 February 2018 and referred to the Supply Code Review Panel; no comments were received on the NOC issue, though other issues drew stakeholder responses that were considered (p1).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document