Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft

Himachal Pradesh Electricity Supply Code (Sixth Amendment) Regulations, 2024

Draft amendmentDated 10 Oct 2024No. HPERC/Secy/438 dated 10th Oct, 2024

Draft

A proposal that has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this notification at Shimla on 10 October 2024 to publish, for public objection, a draft sixth amendment to the Himachal Pradesh Electricity Supply Code, 2009 (p1). The Commission records that HPSEBL and other stakeholders proposed changes because the Code is proving difficult to implement, and that the Supply Code Review Panel considered them at its meeting on 21 June 2024 (p1). Objections and suggestions are invited within thirty (30) days of publication of the notification in the Rajpatra, Himachal Pradesh, and the draft will be taken up after that period expires (p1). The Regulations themselves would come into force on publication in the Rajpatra (p2).

Clauses 2–9 (pp2–5) rebuild the Code's connection-voltage framework: a new definition of a Resident Welfare Association; a proviso letting the Commission align the Code with Ministry of Power Rules without a Review Panel recommendation; substitution of the table fixing standard supply voltages against maximum connected load and contract demand from LT up to 220 kV; removal of joint dedicated feeder references and of paras 2.1.6.1(B) and 2.1.6.2; and new provisos on lower voltage supply surcharge, migration to standard voltage, the domestic connected-load ceiling, common feeder record-keeping, and the treatment of special category loads and dedicated feeders.

Clauses 10–15 (pp5–6) address service delivery: revised release-of-supply timelines by area category with a definition of hilly areas; new paras 3.1A and 3.1B on connections for residents of Resident Welfare Associations (single-point versus individual connections, metering and billing responsibility, no-profit-no-loss resale, common area supply) and on separate connections for EV charging; a shortened response time in para 3.3.1(i); removal of temporary contract demand facilities; and omission of para 3.10.

Clauses 16–21 (pp7–8) cover metering, billing and disconnection: an additional meter on a consumption-mismatch complaint; adjustment of charges in CT/PT error cases; smart-meter provisions on maximum demand penalties and automatic revision of sanctioned load; e-mail delivery of bills for single-part-tariff smart-meter consumers; a new ground for disconnection of consumers who stay on lower-than-standard voltage; and a carve-out for smart prepayment meters.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document