HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Himachal Pradesh Electricity Supply (Sixth Amendment) Code, 2025
AmendmentDated 17 Mar 2025In force from 1 Apr 2025No. HPERC/Supply Code/438 dated 17th March, 2025
Amends the Himachal Pradesh Electricity Supply Code, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification No. HPERC/Supply Code/438, dated 17 March 2025, makes the sixth set of amendments to the Himachal Pradesh Electricity Supply Code, 2009, and comes into force on 1 April 2025 (p1). It is twelve amending paragraphs that rewrite definitions, voltage-wise connection rules, service timelines, metering and billing practice, and disconnection grounds in the Principal Code.
Paras 2 and 3 amend the definitions and the Code's own amendment machinery: new definitions of 'Accuracy' (tied to CEA regulations under s.55 of the Act) and of a Resident Welfare Association, plus a proviso allowing the Commission to align the Code with Ministry of Power rules without a recommendation of the Supply Code Review Panel (p1–2).
Para 4 is the largest change, rewriting para 2.1.6.1 on standard supply voltage: a substituted voltage/connected-load/contract-demand table, a special domestic-category ceiling, a reduced special-category load limit, and a staged transitional regime for existing consumers on lower-than-standard voltage — LVSS to 01.04.2026, then compounding incremental charges, with permanent disconnection as the endpoint after 01.03.2027. It also defines 'dedicated feeder' and 'special category loads' and deletes two sub-paras (p2–4).
Paras 5–9 amend connection and service timelines (area-wise periods including hilly terrain, shortened completion timelines), remove the test report requirement for transfer of title or change of name of a deceased consumer, link performance-standard breaches to the 2010 Distribution Performance Standards Regulation, and insert new paras 3.1A and 3.1B — a special regime for Resident Welfare Associations (single-point versus individual connections decided by ballot, separated metering and billing, no-profit-no-loss resale) and separate supply connections for EV charging (p4–7).
Paras 10–12 cover metering and enforcement: a verification meter on complaint about meter reading, overhauling of accounts where errors stem from wrong CT/PT connections or multiplication factors, smart-meter maximum-demand billing with automatic sanctioned-load reset, deemed delivery of e-mailed bills, and a new disconnection ground for failure to switch to standard voltage with a carve-out for smart prepayment meters (p7–8).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.