HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
Himachal Pradesh Electricity Supply Code (Second Amendment) Regulations, 2018
Draft amendmentDated 23 Jan 2018HPERC/Secy/151 dated 23rd January, 2018
Draft
A proposal that has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment to the Himachal Pradesh Electricity Supply Code, 2009, published for consultation by the Himachal Pradesh Electricity Regulatory Commission on 23 January 2018 (p1). The Commission states the draft will be taken into consideration after thirty days from publication in the Rajpatra, along with any objections or suggestions received, and gives its objective as rationalising the Code's provisions to ease doing business (p1). It records that the changes were deliberated by the Supply Code Review Panel constituted under the Code, and points to an Explanatory Memorandum on its website (p1).
Six amending regulations follow. Regulation 1 gives the short title and splits commencement, deferring regulation 4 alone to 1 April 2018 (p1–2). Regulation 2 inserts a new para 3.1.2.1 barring the licensee from refusing a new connection solely because the applicant cannot produce a No Objection Certificate from a statutory authority such as a Panchayat, Municipality or Town and Country Development Authority — for domestic supply, and for non-domestic connections within a stated connected-load and contract-demand ceiling — against an undertaking that supply may be disconnected on a legally binding order (p2). Regulation 3 lengthens one time limit in the table in para 3.9.1 and adds a proviso letting a designated licensee authority relax time limits where the delay is beyond the applicant's control (p2–3). Regulation 4 rewrites the contract-demand proviso in para 3.10, prescribing how a consumer schedules and revises contract demand, the conditions a schedule must meet, deemed revision by the licensee, and pro-rata treatment of part-year cases, with an illustration (p3–5). Regulation 5 replaces the interest formula in para 5.7.3 for excess amounts (p5). Regulation 6 substitutes item (iii) of para 6.1.9, requiring the Assessing Officer to pass a speaking order within thirty days of personal hearing in unauthorised-use cases and to assess consumption per Annexure-A of the Code (p5).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.