Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft

Himachal Pradesh Electricity Supply Code (Second Amendment) Regulations, 2018

Draft amendmentDated 23 Jan 2018HPERC/Secy/151 dated 23rd January, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment to the Himachal Pradesh Electricity Supply Code, 2009, published for consultation by the Himachal Pradesh Electricity Regulatory Commission on 23 January 2018 (p1). The Commission states the draft will be taken into consideration after thirty days from publication in the Rajpatra, along with any objections or suggestions received, and gives its objective as rationalising the Code's provisions to ease doing business (p1). It records that the changes were deliberated by the Supply Code Review Panel constituted under the Code, and points to an Explanatory Memorandum on its website (p1).

Six amending regulations follow. Regulation 1 gives the short title and splits commencement, deferring regulation 4 alone to 1 April 2018 (p1–2). Regulation 2 inserts a new para 3.1.2.1 barring the licensee from refusing a new connection solely because the applicant cannot produce a No Objection Certificate from a statutory authority such as a Panchayat, Municipality or Town and Country Development Authority — for domestic supply, and for non-domestic connections within a stated connected-load and contract-demand ceiling — against an undertaking that supply may be disconnected on a legally binding order (p2). Regulation 3 lengthens one time limit in the table in para 3.9.1 and adds a proviso letting a designated licensee authority relax time limits where the delay is beyond the applicant's control (p2–3). Regulation 4 rewrites the contract-demand proviso in para 3.10, prescribing how a consumer schedules and revises contract demand, the conditions a schedule must meet, deemed revision by the licensee, and pro-rata treatment of part-year cases, with an illustration (p3–5). Regulation 5 replaces the interest formula in para 5.7.3 for excess amounts (p5). Regulation 6 substitutes item (iii) of para 6.1.9, requiring the Assessing Officer to pass a speaking order within thirty days of personal hearing in unauthorised-use cases and to assess consumption per Annexure-A of the Code (p5).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Theft and unauthorised use, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document