HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
Himachal Pradesh Electricity Supply Code (Fourth Amendment) Regulations, 2020
AmendmentDated 3 Jul 2020No.HPERC/Secy/438.- dated the 3rd July, 2020
Amends the Himachal Pradesh Electricity Supply Code, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to the Himachal Pradesh Electricity Supply Code, 2009, notified by HPERC from Shimla on 3 July 2020 and coming into force on publication in the Rajpatra, Himachal Pradesh (the gazette date is not printed) (p1). It is a short, surgical instrument — eight numbered regulations — touching connection charges, phased load build-up, recovery of a previous consumer's dues from a new occupier, and disconnection practice.
Regulation 2 inserts a proviso into sub-para 3.2.2 capping the advance share of infrastructure development charges a licensee may collect for granting a PAC, cross-referring to the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 (p1). Regulation 3 substitutes para 3.9 wholesale, creating a regime for applicants who want their full ultimate contract demand sanctioned in advance but intend to build load in phases: the licensee sanctions and builds for the total demand, must issue a 60-day readiness notice, and in the interim bills demand charges against a minimum-demand table keyed to billing months, with carve-outs for consumers who submit test reports covering 80% or more of the sanctioned load (p2–3).
Regulation 4 deletes the bar on charging a new occupant for the previous consumer's dues and inserts sub-para 5.2.13A allowing such recovery, capped by reference to average billing, with provisos on original owners, adjustment of the previous consumer's security deposit, refunds where recovery is later made from the old consumer, and an override in favour of the 2012 Recovery of Expenditure Regulations (p3–4). Regulations 5–7 make early disconnection workable: a licensee may permanently disconnect after three but before six months of temporary disconnection where it has evidence supply is unlikely to be restored, after two consecutive fortnightly notices (p4–5); conforming changes follow in sub-paras 7.1.3 and 7.1.9, the latter replacing delayed payment surcharge after permanent disconnection with simple interest (p5). Regulation 8 revises sub-para 7.2.1 on resumption of supply and adds a 24-hour new-connection note (p5–6).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.