HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020

Himachal Pradesh Electricity Supply Code (Fourth Amendment) Regulations, 2020

AmendmentDated 3 Jul 2020No.HPERC/Secy/438.- dated the 3rd July, 2020

Amends the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the Himachal Pradesh Electricity Supply Code, 2009, notified by HPERC from Shimla on 3 July 2020 and coming into force on publication in the Rajpatra, Himachal Pradesh (the gazette date is not printed) (p1). It is a short, surgical instrument — eight numbered regulations — touching connection charges, phased load build-up, recovery of a previous consumer's dues from a new occupier, and disconnection practice.

Regulation 2 inserts a proviso into sub-para 3.2.2 capping the advance share of infrastructure development charges a licensee may collect for granting a PAC, cross-referring to the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 (p1). Regulation 3 substitutes para 3.9 wholesale, creating a regime for applicants who want their full ultimate contract demand sanctioned in advance but intend to build load in phases: the licensee sanctions and builds for the total demand, must issue a 60-day readiness notice, and in the interim bills demand charges against a minimum-demand table keyed to billing months, with carve-outs for consumers who submit test reports covering 80% or more of the sanctioned load (p2–3).

Regulation 4 deletes the bar on charging a new occupant for the previous consumer's dues and inserts sub-para 5.2.13A allowing such recovery, capped by reference to average billing, with provisos on original owners, adjustment of the previous consumer's security deposit, refunds where recovery is later made from the old consumer, and an override in favour of the 2012 Recovery of Expenditure Regulations (p3–4). Regulations 5–7 make early disconnection workable: a licensee may permanently disconnect after three but before six months of temporary disconnection where it has evidence supply is unlikely to be restored, after two consecutive fortnightly notices (p4–5); conforming changes follow in sub-paras 7.1.3 and 7.1.9, the latter replacing delayed payment surcharge after permanent disconnection with simple interest (p5). Regulation 8 revises sub-para 7.2.1 on resumption of supply and adds a 24-hour new-connection note (p5–6).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Late payment surcharge and rebate

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document