The document is the Himachal Pradesh Electricity Regulatory Commission notification dated 26 May 2009 promulgating the Himachal Pradesh Electricity Supply Code, 2009. It is made under Section 50 and Section 181(2)(x) of the Electricity Act 2003 and applies across Himachal Pradesh to distribution and retail supply licensees including deemed licensees, their consumers, persons exempted under Section 13, and incidents of unauthorized use and theft (p1). It comes into force from publication in the Rajpatra, Himachal Pradesh.
Chapter I (pp1–11) sets the Code's title, extent, application, commencement and definitions; it also creates a standing Electricity Supply Code Review Panel and lays down how the Code is reviewed, amended, published and kept current (pp8–11). No Code change is to be made without Review Panel deliberation and Commission approval, except a provisional emergency revision (p8).
Chapter II (pp12–16) specifies the system of supply: nominal frequency and voltage classes, point of commencement of supply, standard supply voltage by connected load, power-factor obligation, treatment of disturbing loads, harmonics monitoring and consequences, and transition rules for existing terms and conditions of supply. Consumer classification and tariffs are left to the Commission's Tariff Order (p16).
Chapter III (pp17–25) governs matters related to supply: application and agreement procedure, the licensee's duty to supply, the Power Availability Certificate for new or additional load above 100 kW, temporary supply, exceptions from the duty to supply, transfer of title/change of category/voltage conversion and other services, adjustment of deposits, additional terms, refunds of initial security and charges, and charging where a consumer delays taking HT/EHT supply.
Chapter IV (pp25–31) deals with meters and metering equipment: requirement of correct meters under the CEA (Installation and Operation of Meters) Regulations, 2006; supply, installation and sealing; testing and NABL-accredited laboratories; defective meter testing, replacement, and overhauling of consumer accounts.
Chapter V (pp32–39) covers billing: recovery of charges, bill contents and delivery, reading, pro-rata charges, payment timelines and modes, advance payment, late payment surcharge, adjustment of underpayments and limitation on recovery of dues, and the procedure for disputed bills and refunds or adjustments.
Chapter VI (pp40–43) begins the unauthorized-use and theft regime: inspection by an assessing officer, inspection reports, provisional assessment, final assessment after objections, appeal to the appellate authority, interest on refunds and deposits, and default in payment of assessed amounts.
Read with this
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.