Himachal Pradesh Electricity Supply Code, 2009

CodeDated 26 May 2009No. HPERC/390-09 dated 26th May, 2009

6 amendments to it are on Voltaic, the latest dated 17 Mar 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 43 of 67. Check the regulator's original before you rely on it.

The document is the Himachal Pradesh Electricity Regulatory Commission notification dated 26 May 2009 promulgating the Himachal Pradesh Electricity Supply Code, 2009. It is made under Section 50 and Section 181(2)(x) of the Electricity Act 2003 and applies across Himachal Pradesh to distribution and retail supply licensees including deemed licensees, their consumers, persons exempted under Section 13, and incidents of unauthorized use and theft (p1). It comes into force from publication in the Rajpatra, Himachal Pradesh.

Chapter I (pp1–11) sets the Code's title, extent, application, commencement and definitions; it also creates a standing Electricity Supply Code Review Panel and lays down how the Code is reviewed, amended, published and kept current (pp8–11). No Code change is to be made without Review Panel deliberation and Commission approval, except a provisional emergency revision (p8).

Chapter II (pp12–16) specifies the system of supply: nominal frequency and voltage classes, point of commencement of supply, standard supply voltage by connected load, power-factor obligation, treatment of disturbing loads, harmonics monitoring and consequences, and transition rules for existing terms and conditions of supply. Consumer classification and tariffs are left to the Commission's Tariff Order (p16).

Chapter III (pp17–25) governs matters related to supply: application and agreement procedure, the licensee's duty to supply, the Power Availability Certificate for new or additional load above 100 kW, temporary supply, exceptions from the duty to supply, transfer of title/change of category/voltage conversion and other services, adjustment of deposits, additional terms, refunds of initial security and charges, and charging where a consumer delays taking HT/EHT supply.

Chapter IV (pp25–31) deals with meters and metering equipment: requirement of correct meters under the CEA (Installation and Operation of Meters) Regulations, 2006; supply, installation and sealing; testing and NABL-accredited laboratories; defective meter testing, replacement, and overhauling of consumer accounts.

Chapter V (pp32–39) covers billing: recovery of charges, bill contents and delivery, reading, pro-rata charges, payment timelines and modes, advance payment, late payment surcharge, adjustment of underpayments and limitation on recovery of dues, and the procedure for disputed bills and refunds or adjustments.

Chapter VI (pp40–43) begins the unauthorized-use and theft regime: inspection by an assessing officer, inspection reports, provisional assessment, final assessment after objections, appeal to the appellate authority, interest on refunds and deposits, and default in payment of assessed amounts.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.