Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order

In the matter of draft amendment regulations i.e. Himachal Pradesh Electricity Supply Code (Fourth Amendment) Regulations, 2020.

OrderDated 3 Jul 2020Published in the Gazette 24 Jan 2020

Read with the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission's order of 3 July 2020 (p21) finalises the draft Himachal Pradesh Electricity Supply Code (Fourth Amendment) Regulations, 2020, after a public consultation process (p1–2). It records the Supply Code's history, the Review Panel's recommendations, the draft notification and Rajpatra publication in January 2020, newspaper notices, stakeholder letters, and the public hearing on 13 March 2020 (p1–2).

The order reproduces and decides on objections. HPSEBL raised only a general point about the Himachal Pradesh High Court's 'item G'; Industries Associations objected to the proposed recovery of previous consumers' dues from new occupiers, relying on Supreme Court and Delhi High Court judgments (p2–4, p6–14). The Commission distinguishes those judgments and concludes that the Supply Code may provide for such recovery, and that the licensee may require clearance of dues before restoring or giving a new connection (p10–16).

Operatively, the order directs amendments to the Supply Code: sub-para 3.2.2 (cap on advance infrastructure development charges) (p4); para 3.9 (phased build-up of contract demand and interim demand charges) (p4–6); sub-para 5.2.13 and new 5.2.13A (recovery of previous consumer's outstanding dues from the next owner/occupier, with maximum recovery, refund and overriding provisions) (p6–17); sub-paras 7.1.2, 7.1.3, 7.1.9 and 7.2.1 (earlier permanent disconnection in specified cases, interest on post-disconnection dues, and restoration/new connection timelines) (p18–19). Miscellaneous items address additional information from high-end consumers and tariff-related suggestions, which are not taken into the Supply Code at this stage (p19–21).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document