HPERC · Himachal Pradesh Electricity Regulatory Commission
List of Documents for Two-Part Tariff Connections under the Electricity Supply Code, 2009 — Suo-Motu Order 44/2022 — Draft
Finalization of list of documents under sub-para (3.1.2) of para 3.1 of Himachal Pradesh Electricity Supply Code, 2009 required to release the electricity connections covered under two part tariff.
Draft procedureDated 16 Jul 2022Suo-Motu Petition No.: 44 /2022 dated 16.07.2022
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's suo-motu order in Petition No. 44/2022, dated 16.07.2022, sets out — as a proposal open to stakeholder comment — the list of documents a distribution licensee must obtain before releasing an electricity connection billed on two-part tariff in Himachal Pradesh (p1). It is made under sub-para (3.1.2) of para 3.1 of the HP Electricity Supply Code, 2009 and Regulation 67 of the Commission's Conduct of Business Regulations, 2005; comments are invited by 20 August 2022 (p1).
Paragraphs 1–3 recite the Code's notification on 26 May 2009, its gazette publication, and five subsequent amendments published between 16 August 2014 and 21 January 2022, then propose the document list at Annexure-A and give the address for objections (p1–2).
Annexure-A (pp3–4) is the substance. It groups the paperwork into general requirements (application and agreement form, licensed contractor's test report, power availability certificate where the contract demand threshold is crossed, Chief Electrical Inspector approval for HT/EHT energisation, project report for industrial loads, registration or single-window clearance, statutory NOCs), photo identity proof (any one of six listed documents) and proof of ownership or occupancy (any of several revenue, sale, lease or allotment documents). Where a statutory NOC cannot be produced, the connection may instead be released under the temporary metered supply category on a plain-paper undertaking. For firms, companies and trusts it adds deed or incorporation documents, board resolutions and notarised powers of attorney. Two notes preserve the licensee's right to call for extra documents and to publish situation-specific lists, and extend the requirements — minus the statutory NOC — to change of name of an existing connection.
Annexure-I (pp5–6) supplies the format of the undertaking/declaration for temporary metered supply, covering the applicant's undertakings on disconnection, regularization only after building completion plan sanction, adjustment of dues against security deposit, and verification.
Because the order only proposes the list and awaits comments, the checklist should be read as draft until finalised (p1).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.