List of Documents for Two-Part Tariff Connections under the Electricity Supply Code, 2009 — Suo-Motu Order 44/2022 — Draft

Finalization of list of documents under sub-para (3.1.2) of para 3.1 of Himachal Pradesh Electricity Supply Code, 2009 required to release the electricity connections covered under two part tariff.

Draft procedureDated 16 Jul 2022Suo-Motu Petition No.: 44 /2022 dated 16.07.2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's suo-motu order in Petition No. 44/2022, dated 16.07.2022, sets out — as a proposal open to stakeholder comment — the list of documents a distribution licensee must obtain before releasing an electricity connection billed on two-part tariff in Himachal Pradesh (p1). It is made under sub-para (3.1.2) of para 3.1 of the HP Electricity Supply Code, 2009 and Regulation 67 of the Commission's Conduct of Business Regulations, 2005; comments are invited by 20 August 2022 (p1).

Paragraphs 1–3 recite the Code's notification on 26 May 2009, its gazette publication, and five subsequent amendments published between 16 August 2014 and 21 January 2022, then propose the document list at Annexure-A and give the address for objections (p1–2).

Annexure-A (pp3–4) is the substance. It groups the paperwork into general requirements (application and agreement form, licensed contractor's test report, power availability certificate where the contract demand threshold is crossed, Chief Electrical Inspector approval for HT/EHT energisation, project report for industrial loads, registration or single-window clearance, statutory NOCs), photo identity proof (any one of six listed documents) and proof of ownership or occupancy (any of several revenue, sale, lease or allotment documents). Where a statutory NOC cannot be produced, the connection may instead be released under the temporary metered supply category on a plain-paper undertaking. For firms, companies and trusts it adds deed or incorporation documents, board resolutions and notarised powers of attorney. Two notes preserve the licensee's right to call for extra documents and to publish situation-specific lists, and extend the requirements — minus the statutory NOC — to change of name of an existing connection.

Annexure-I (pp5–6) supplies the format of the undertaking/declaration for temporary metered supply, covering the applicant's undertakings on disconnection, regularization only after building completion plan sanction, adjustment of dues against security deposit, and verification.

Because the order only proposes the list and awaits comments, the checklist should be read as draft until finalised (p1).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.