Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft

Explanatory Memorandum for the Draft Himachal Pradesh Electricity Supply Code (Second Amendment) Regulations, 2018

Explanatory memorandum to a draftDated 30 Jan 2018

Explanatory memorandum to the Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this explanatory memorandum in January 2018 to explain five amendments it proposes to the Himachal Pradesh Electricity Supply Code, 2009 (p1–2). It is not the amendment itself: for each item it records the background, the stakeholder suggestion and the Supply Code Review Panel's recommendation, and points to the proposed notification for the actual clause text (p2). The memorandum recalls that the Code was notified in 2009 and first amended in 2014 (p2).

Item I (p2–3) would insert a new paragraph 3.1.2 doing away with no-objection certificates from panchayats, municipalities, development authorities and town-planning bodies before a connection is released, and would bar the licensee from refusing a connection for domestic supply or for non-domestic supply with connected load and contract demand not exceeding 20kW and 20kVA respectively, with a declaration/undertaking and disconnection on a statutory order as the safeguard.

Item II (p3–4) amends paragraph 3.9 on demand charges where a consumer does not avail the full sanctioned contract demand: it extends the initial grace period, during which demand charges are levied only on the maximum demand actually availed, from six to twelve months and adds a savings clause for delays beyond the applicant's reasonable control.

Item III (p4) amends paragraph 3.10 so that two-part-tariff consumers who may temporarily revise contract demand must avail the full sanctioned contract demand for at least six months in a year.

Item IV (p4–5) replaces the interest payable on excess amounts recovered through erroneous billing — twice SBI's Short Term PLR — with simple interest at 15% per annum, or the rate fixed by the Commission, following the migration of lending rates to a base-rate system.

Item V (p5) substitutes item (iii) of paragraph 6.1.9 so that assessment orders for unauthorized use of electricity under section 126 of the Electricity Act must be speaking orders with reasons rather than summary orders.

No commencement or consultation date is stated; the changes remain proposals.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.