HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
Explanatory Memorandum for the Draft Himachal Pradesh Electricity Supply Code (Second Amendment) Regulations, 2018
Explanatory memorandum to a draftDated 30 Jan 2018
Draft
The draft has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018.
Explanatory memorandum to the Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission issued this explanatory memorandum in January 2018 to explain five amendments it proposes to the Himachal Pradesh Electricity Supply Code, 2009 (p1–2). It is not the amendment itself: for each item it records the background, the stakeholder suggestion and the Supply Code Review Panel's recommendation, and points to the proposed notification for the actual clause text (p2). The memorandum recalls that the Code was notified in 2009 and first amended in 2014 (p2).
Item I (p2–3) would insert a new paragraph 3.1.2 doing away with no-objection certificates from panchayats, municipalities, development authorities and town-planning bodies before a connection is released, and would bar the licensee from refusing a connection for domestic supply or for non-domestic supply with connected load and contract demand not exceeding 20kW and 20kVA respectively, with a declaration/undertaking and disconnection on a statutory order as the safeguard.
Item II (p3–4) amends paragraph 3.9 on demand charges where a consumer does not avail the full sanctioned contract demand: it extends the initial grace period, during which demand charges are levied only on the maximum demand actually availed, from six to twelve months and adds a savings clause for delays beyond the applicant's reasonable control.
Item III (p4) amends paragraph 3.10 so that two-part-tariff consumers who may temporarily revise contract demand must avail the full sanctioned contract demand for at least six months in a year.
Item IV (p4–5) replaces the interest payable on excess amounts recovered through erroneous billing — twice SBI's Short Term PLR — with simple interest at 15% per annum, or the rate fixed by the Commission, following the migration of lending rates to a base-rate system.
Item V (p5) substitutes item (iii) of paragraph 6.1.9 so that assessment orders for unauthorized use of electricity under section 126 of the Electricity Act must be speaking orders with reasons rather than summary orders.
No commencement or consultation date is stated; the changes remain proposals.
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.