HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
Himachal Pradesh Electricity Supply Code (Fifth Amendment) Regulations, 2021
Draft amendmentDated 18 Oct 2021No. HPERC/Secy/438 dated 18th October, 2021
Draft
A proposal that has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission issued this notification on 18 October 2021 (p1) proposing the fifth round of amendments to the Himachal Pradesh Electricity Supply Code, 2009. It is a consultation draft: the recitals give the reasons — the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 need to be reflected in the Code, and the Commission's 2004 Regulations on a licensee's duty to supply on request are to be absorbed into it — and state that the draft will be taken up only after 30 days from publication in the Rajpatra, with objections and suggestions addressed to the Secretary (pp1–2).
Clause 1 gives the short title and makes commencement run from publication in the Rajpatra (p2). Clause 2 rewrites and adds Chapter I definitions — applicant, billing cycle, disconnection, distribution main and occupier (pp2–3). Clause 3 changes the standard voltage figure used in Chapter II's single-phase supply table and proviso (p3). Clause 4 is the largest: it reworks Chapter III on supply of electricity — standardised application and agreement forms with a reduced mandatory document list for single-part-tariff applicants, website disclosure, a web portal and mobile app, registration-number acknowledgements and application tracking, deadlines for demand notices and for energisation by connection type, liability relief and compensation for delay, facilities and doorstep service for senior citizens and physically challenged consumers, temporary supply timelines, and replacement of references to the 2004 Regulations (pp3–10).
Clauses 5 and 6 cover metering and billing: a phased smart/pre-payment meter road map, consumer awareness before replacement, meter custody and testing, third-party testing and meter replacement (pp10–13); and billing on actual meter reading with limits on average billing, tariff display, reading frequency for smart and other pre-payment meters, self-assessment billing, bill delivery and payment modes with drop boxes, and a slab-based rebate for advance payment (pp13–18). Clause 7 sets permanent disconnection and reconnection procedure, deferring reconnection timelines to the Distribution Performance Standards Regulations, 2010 (pp18–19). Clause 8 inserts a repeal and savings provision removing the 2004 Regulations while preserving past actions (p19).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.