Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft

Himachal Pradesh Electricity Supply Code (Fifth Amendment) Regulations, 2021

Draft amendmentDated 18 Oct 2021No. HPERC/Secy/438 dated 18th October, 2021

Draft

A proposal that has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this notification on 18 October 2021 (p1) proposing the fifth round of amendments to the Himachal Pradesh Electricity Supply Code, 2009. It is a consultation draft: the recitals give the reasons — the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 need to be reflected in the Code, and the Commission's 2004 Regulations on a licensee's duty to supply on request are to be absorbed into it — and state that the draft will be taken up only after 30 days from publication in the Rajpatra, with objections and suggestions addressed to the Secretary (pp1–2).

Clause 1 gives the short title and makes commencement run from publication in the Rajpatra (p2). Clause 2 rewrites and adds Chapter I definitions — applicant, billing cycle, disconnection, distribution main and occupier (pp2–3). Clause 3 changes the standard voltage figure used in Chapter II's single-phase supply table and proviso (p3). Clause 4 is the largest: it reworks Chapter III on supply of electricity — standardised application and agreement forms with a reduced mandatory document list for single-part-tariff applicants, website disclosure, a web portal and mobile app, registration-number acknowledgements and application tracking, deadlines for demand notices and for energisation by connection type, liability relief and compensation for delay, facilities and doorstep service for senior citizens and physically challenged consumers, temporary supply timelines, and replacement of references to the 2004 Regulations (pp3–10).

Clauses 5 and 6 cover metering and billing: a phased smart/pre-payment meter road map, consumer awareness before replacement, meter custody and testing, third-party testing and meter replacement (pp10–13); and billing on actual meter reading with limits on average billing, tariff display, reading frequency for smart and other pre-payment meters, self-assessment billing, bill delivery and payment modes with drop boxes, and a slab-based rebate for advance payment (pp13–18). Clause 7 sets permanent disconnection and reconnection procedure, deferring reconnection timelines to the Distribution Performance Standards Regulations, 2010 (pp18–19). Clause 8 inserts a repeal and savings provision removing the 2004 Regulations while preserving past actions (p19).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document