Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order

Finalization of the Himachal Pradesh Electricity Supply (Sixth Amendment) Code, 2024.

OrderDated 17 Mar 2025

Read with the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the HPERC order of 17.03.2025 finalising the Himachal Pradesh Electricity Supply (Sixth Amendment) Code (styled "2024" in the cause-title, "2025" at para 13) (p1, p17). It is a reasoned order, not the amended text: paras 1–11 record the procedure followed — draft notified 10.10.2024, gazetted 21.10.2024, objections invited to 22.11.2024, and a public hearing on 09.12.2024 (p1–2) — and then give the Commission's disposition of each stakeholder objection to the draft amendments of the Principal Supply Code, 2009 (p3).

Paras I–XXV work through the amendments one by one. On standard supply voltage (sub-para 2.1.6.1(A)) the Commission retains the load-limit columns and the special-category load cap, and retains an incremental surcharge alongside LVSS, redrafting the fifth proviso to create a switch-over window and a disconnection path (p4–7); it drops the sixth proviso and moves a domestic-category load proviso below the table (p7). It orders omission of sub-paras 2.1.6.1(B) and 2.1.6.2 (p8–9), amends the hilly-terrain Explanations (p9), inserts paras 3.1A/3.1B on colony substations (p10–11), forgoes the para 3.9/3.10 amendments but adds a performance-standards clause (p11–12), and addresses metering definitions and overhauling of accounts (p12–14). It revises the bill-on-recorded-maximum-demand provisions (p14–15), adds a standard-voltage default ground for disconnection (p16), and adds a proviso easing title transfer for deceased consumers (p16). The amendment is enforced from 01.04.2025 (p17); Annexure-A lists the public-hearing participants (p18).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document