HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
Himachal Pradesh Electricity Supply Code (Fourth Amendment) Regulations, 2020
Draft amendmentDated 20 Jan 2020No. HPERC/Secy/151 dated 20th January, 2020
Draft
A proposal that has since been finalised as the Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's draft of the Fourth Amendment to the Himachal Pradesh Electricity Supply Code, 2009 — proposed, not yet made. Notification No. HPERC/Secy/151, dated 20 January 2020 (p1), opens with recitals: the 2009 Code and its publication in the Rajpatra on 29 May 2009, amendment proposals from HPSEBL and the Industries Association to remove implementation difficulties, a view expressed by the Hon'ble High Court of HP that certain HPSEBL proposals require the Commission's approval, and the requirement under Clause 1.3.1.1 that no change to the Code be made without the Supply Code Review Panel's recommendation (p1). The Panel was reconstituted by publication dated 17.12.2019 and met on 30.12.2019 to forward its recommendations (p1–2). The Commission proposes the amendments under Section 50 and Section 181(2)(x) of the Electricity Act, 2003 read with Section 21 of the General Clauses Act, 1897, and publishes the draft for objections and suggestions to be received within thirty days of publication in the Rajpatra; the draft is also on the Commission's website (p2).
The operative draft has eight clauses. Clauses 1 and 2 give the short title and commencement and add a proviso to sub-para 3.2.2 capping the advance share of infrastructure development charges recoverable for grant of PAC at the IDC recoverable under the 2012 Recovery of Expenditure Regulations (p2–3).
Clause 3 substitutes para 3.9 wholly, creating a regime for applicants who obtain sanction of their total contract demand in advance while building load in phases: the licensee's power to sanction, recovery of charges, a 60-day notice of readiness to supply, and a staged schedule for charging demand during the interim period, with provisos on test-report-based contract demand, violation charges and a carve-out where test reports cover 80% or more of the sanctioned load (p3–5).
Clauses 4 to 8 amend consumer-service and disconnection provisions: recovery of a previous consumer's outstanding dues from the next occupier (sub-para 5.2.13 and new 5.2.13A, p5–6); permanent disconnection earlier than six months but not before three months of temporary disconnection in specified circumstances (sub-para 7.1.2, p6); a consequential change to sub-para 7.1.3 (p6–7); replacement of the delayed payment surcharge by simple interest on dues after permanent disconnection (sub-para 7.1.9, p7); and clarification of resumption of supply plus a reconnection timeline note for permanently disconnected premises (sub-para 7.2.1, p7–8).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.