Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order

Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014.

OrderDated 9 Jun 2014HPERC/438 dated 09th June, 2014

Read with the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's reasoned order of 9 June 2014 finalising the First Amendment to the Himachal Pradesh Electricity Supply Code, 2009, made under s.50 and s.181(2)(x) of the Electricity Act, 2003 (p1). It first records the pre-publication steps — draft published in the Rajpatra on 28 April 2014, newspaper notices on 27 April 2014, objections due 12 May 2014, and reference to the Supply Code Review Panel, which met on 3 May 2014 — and lists the five industrial and hotel bodies that responded (p1–2).

It then works through each proposed change, giving the objections, the Review Panel's recommendations and the Commission's decision, and follows most decisions with the text of the substituted or inserted paragraph of the Code (p2–16). Substantively it rewrites para 2.1.6.1 on standard supply voltage, linking voltage to connected load and contract demand, adding a ceiling table by voltage level, a regime for supply below standard voltage with LVSS, treatment of special category loads, and definitions of dedicated and joint dedicated feeder (p2–8); replaces the whole of para 3.2 on the Power Availability Certificate, its advance cost share, grant timeline, validity and adjustment/forfeiture rules (p8–10); substitutes para 3.8 on refunds on withdrawal of an application (p10–11) and para 3.9 on demand charges where a consumer delays taking supply (p11–12); amends the billing and payment paragraphs 5.2, 5.2.5, 5.2.9, 5.3.1, 5.4 and 5.5 (p12–13); inserts a new para 3.10 allowing temporary revision of contract demand without NOC (p13–14); carves out increases in connected load that will not count as unauthorised use under s.126 (p14–15); and modifies the disconnection paragraphs 7.1.1(h) and 7.1.2 (p16).

The order directs that the amendments be notified in the Official Gazette. That date is not printed, and para 16 leaves the Commission free to further simplify or rearrange the Code's text, so the operative wording may differ from what is reproduced here.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document