Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021

Himachal Pradesh Electricity Supply Code (Fifth Amendment) Regulations, 2021

AmendmentDated 14 Jan 2022No. HPERC/Secy/438 dated 14th January, 2022

Amends the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's Fifth Amendment to the Himachal Pradesh Electricity Supply Code, 2009. It is dated 14 January 2022 and comes into force on the date of its Rajpatra publication, which the document does not print (p1). It rewrites the consumer-facing chapters of the Code and, unusually, folds the Commission's 2004 'Licensee's Duty for Supply of Electricity on Request' Regulations into the Code by repealing them (p18).

Chapter I definitions are replaced or added for 'applicant', 'billing cycle', 'disconnection', 'distribution main' and 'occupier' (p1–2), and the voltage reference in Chapter II is changed from 415 volts to 400 volts (p2).

Chapter III is the core. It restates the licensee's duty to supply within Code timelines, standardises the application-and-agreement form, sets mandatory documents for single-part-tariff applicants while leaving the two-part-tariff list to be specified by the Commission, adds website and notice-board disclosure duties, a web portal and mobile app, acknowledgement-based deemed receipt and application tracking (p2–4), and fixes demand-notice and supply timelines by voltage class with an option to seek Commission extension (p4–6). Compensation for missed timelines follows the Distribution Performance Standards Regulations, 2010 (p6). Doorstep and priority service for senior citizens and persons with disabilities is added (p6–7), as are temporary-supply timelines (p7) and revised shifting-of-connection rules for domestic consumers (p8–9).

Chapter IV requires a smart prepaid meter roadmap, publication of meter manufacturer/vendor lists, a change in who is responsible for meter custody, and new meter-testing, third-party testing and meter-replacement procedures (p9–12). Chapter V governs billing: actual-reading billing with limits on average billing, tariff display, smart/prepayment meter read frequency, bill delivery modes, self-assessment billing subject to a Commission-approved procedure, payment channels and drop boxes, an advance-payment rebate, and protection from disconnection notices for absent domestic consumers (p12–17). Chapter VII revises permanent disconnection and reconnection timelines (p17–18).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗