Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
Notification/Order on disconnection of Supply of Electricity upon Detection of Theft of Electricity
OrderDated 27 Mar 2009HPERC/390-IV/09-4408 dated 27March, 2009
Made under the Himachal Pradesh Electricity Supply Code, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page HPERC notification dated 27 March 2009, issued under s.135(1A) of the Electricity Act 2003 (p1). It authorises named categories of officers of the Himachal Pradesh State Electricity Board to disconnect electricity supply once theft of electricity is detected in Himachal Pradesh, mapping classes of consumers to the officer empowered to act in each case (p1).
The mapping is organised by the Board's two wings: the Operation Wing, where posts at Assistant Engineer level and at Executive Engineer level are authorised, each within the limits stated against them; and the Enforcement Wing, whose officers are authorised for the consumer classes listed (p1).
The notification sets out no procedure for disconnection and no penalty or assessment provisions.
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 11 Jun 2014Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.