Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014

The Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014

AmendmentDated 11 Jun 2014HPERC/438 dated 11th June, 2014

Amends the Himachal Pradesh Electricity Supply Code, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's first amendment to its 2009 Electricity Supply Code, notified at Shimla on 11 June 2014 (p1). The preamble records that a draft was published in the Rajpatra on 28 April 2014, advertised in The Tribune and Amar Ujala on 27 April 2014, hosted on the Commission's website, and referred to the Supply Code Review Panel, with stakeholder comments considered before finalisation (p1). It takes effect from the date of Rajpatra publication, which the text does not print (p1).

The bulk of the amendment rewrites the Code's voltage rules. Clause 3 replaces para 2.1.6 with sub-paras 2.1.6.1(A)–(C), which classify "standard supply voltage" by connected load, contract demand, nature of load and the voltages existing on the local distribution system, set maximum load/demand ceilings per voltage level, provide for lower-voltage supply against a lower voltage supply surcharge, and lay down grandfathering for existing LT consumers, a bar on higher-voltage rebate, and definitions of dedicated and joint dedicated feeders and "special category loads" (p2–6). A separate insertion makes references in the Code track later amendments to referenced regulations (p2).

Clauses 4–7 deal with the connection application process: forms free of cost and downloadable, optional online application with hard-copy follow-up, electronic service of demand notices, and a complete new para 3.2 creating a Power Availability Certificate regime for contract demand above 100 kVA, with advance cost share, validity, adjustment against recovery-of-expenditure charges, and refund on non-availment (p6–8). Clauses 8–10 substitute refund rules on withdrawal of applications, set demand-charge liability where a consumer delays taking supply or does not avail full contract demand, and allow temporary revision of contract demand without surrendering lien (p8–10).

Clauses 11–12 revise billing-cycle rules by area and season, require disputed amounts to be tracked separately, push electronic bill delivery, permit part payment with conditions, and fix the day on which charges fall due (p11–12). Clauses 13–15 carve certain connected-load increases out of "unauthorized use" under section 126, require prior intimation before certain disconnections, and cap demand charges during temporary disconnection (p12–13). Clause 16 lets Annexure-A assessments use tariff-order violation charges (p13).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document