HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Supply Code, 2009 — First Amendment, 2014
The Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014
AmendmentDated 11 Jun 2014HPERC/438 dated 11th June, 2014
Amends the Himachal Pradesh Electricity Supply Code, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's first amendment to its 2009 Electricity Supply Code, notified at Shimla on 11 June 2014 (p1). The preamble records that a draft was published in the Rajpatra on 28 April 2014, advertised in The Tribune and Amar Ujala on 27 April 2014, hosted on the Commission's website, and referred to the Supply Code Review Panel, with stakeholder comments considered before finalisation (p1). It takes effect from the date of Rajpatra publication, which the text does not print (p1).
The bulk of the amendment rewrites the Code's voltage rules. Clause 3 replaces para 2.1.6 with sub-paras 2.1.6.1(A)–(C), which classify "standard supply voltage" by connected load, contract demand, nature of load and the voltages existing on the local distribution system, set maximum load/demand ceilings per voltage level, provide for lower-voltage supply against a lower voltage supply surcharge, and lay down grandfathering for existing LT consumers, a bar on higher-voltage rebate, and definitions of dedicated and joint dedicated feeders and "special category loads" (p2–6). A separate insertion makes references in the Code track later amendments to referenced regulations (p2).
Clauses 4–7 deal with the connection application process: forms free of cost and downloadable, optional online application with hard-copy follow-up, electronic service of demand notices, and a complete new para 3.2 creating a Power Availability Certificate regime for contract demand above 100 kVA, with advance cost share, validity, adjustment against recovery-of-expenditure charges, and refund on non-availment (p6–8). Clauses 8–10 substitute refund rules on withdrawal of applications, set demand-charge liability where a consumer delays taking supply or does not avail full contract demand, and allow temporary revision of contract demand without surrendering lien (p8–10).
Clauses 11–12 revise billing-cycle rules by area and season, require disputed amounts to be tracked separately, push electronic bill delivery, permit part payment with conditions, and fix the day on which charges fall due (p11–12). Clauses 13–15 carve certain connected-load increases out of "unauthorized use" under section 126, require prior intimation before certain disconnections, and cap demand charges during temporary disconnection (p12–13). Clause 16 lets Annexure-A assessments use tariff-order violation charges (p13).
Read with this
The regulation
- Dated 26 May 2009Himachal Pradesh Electricity Supply Code, 2009
Amendments and corrections
- Dated 31 Jul 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment Regulations, 2018
- Dated 3 Dec 2018Himachal Pradesh Electricity Supply Code, 2009 — Third Amendment, 2018
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020
- Dated 14 Jan 2022Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2025
Commencement notices and reasons
- Dated 12 Nov 2012H.P. Electricity Supply Code Review Panel Constitution Notification, 2012
- Dated 9 Jun 2014Himachal Pradesh Electricity Supply Code (First Amendment) Regulations, 2014 — Order
- Dated 3 Jul 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Finalisation Order
- Dated 17 Mar 2025Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Finalization Order
Procedures and orders made under it
- Dated 27 Mar 2009Disconnection of Supply upon Detection of Theft of Electricity Notification, 2009
- Dated 22 Mar 2016Reconstitution of Electricity Supply Code Review Panel, 2016
- Dated 13 Dec 2019Electricity Supply Code Review Panel Reconstitution Notification, 2019
- Dated 27 Jul 2022Reconstitution of the Electricity Supply Code Review Panel, 2022
- Dated 24 Aug 2022HP Electricity Supply Code, 2009 — Release of Electricity Connections under Two Part Tariff — Finalization of List of Documents
- Dated 3 Jul 2026Electricity Supply Code Review Panel Reconstitution Notification, 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 23 Jan 2018Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Draft
- Dated 30 Jan 2018Explanatory memorandum: Himachal Pradesh Electricity Supply Code, 2009 — Second Amendment, 2018 — Explanatory Memorandum — Draft
- Dated 20 Jan 2020Himachal Pradesh Electricity Supply Code, 2009 — Fourth Amendment, 2020 — Draft
- Dated 18 Oct 2021Himachal Pradesh Electricity Supply Code, 2009 — Fifth Amendment, 2021 — Draft
- Dated 10 Oct 2024Himachal Pradesh Electricity Supply Code, 2009 — Sixth Amendment, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.