HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Eighth Amendment) Regulations, 2026
Draft amendmentDated 12 May 2026HPERC/428 dated the 12th May, 2026
Draft
A proposal that has since been finalised as the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment notification issued by the Himachal Pradesh Electricity Regulatory Commission on 12 May 2026 (p1). It publishes, for objections and suggestions, the draft Eighth Amendment to the HPERC (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017, with the stated aim of adding or aligning some provisions with the CERC RE Tariff Regulations, 2024 (p1). The draft will be taken up after 30 days from its publication in the Rajpatra, Himachal Pradesh; comments go to the Secretary, HPERC (p1).
The operative text is short. Clause 1 gives the short title and provides that the regulations come into force from the date of publication in the Rajpatra (p2). Clause 2 amends Regulation 2 of the 2017 Regulations by inserting definitions of 'Biomass' and 'Biomass gasification' and substituting the existing 'Useful Life' clause (p2). The substituted useful-life provision lists the useful life, reckoned from commercial operation and including a dedicated evacuation system, for each type of RE project — wind, biomass, non-fossil-fuel co-generation, small hydro, municipal solid waste/RDF, solar PV/floating/thermal, biomass gasifier, biogas, renewable hybrid, and renewable energy with storage — and specifies how useful life is to be worked out for hybrid and storage projects (p2). The document does not set tariff values; it only changes definitions and useful-life treatment in the 2017 framework.
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.