HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fourth Amendment) Regulations, 2020
AmendmentDated 8 Sep 2020In force from 1 Apr 2020No. HPERC/428. dated 08th September, 2020
Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to Himachal Pradesh's 2017 renewable-energy tariff regulations. It was notified by HPERC on 8 September 2020 but is expressed to come into force from 1 April 2020, so it applies retrospectively for the intervening months (p1). Its main work is to open and populate the third control period for RE tariffs, which regulation 9(1) is amended to define as running from 1 April 2020 to 30 September 2023 (p1).
Regulation 4 inserts a new Part-III into Chapter IV (regulations 21-B to 32-BB, pp2–8), which fixes how tariffs for that window are computed. It covers what the capital cost norm includes and what is excluded from it; how central and state subsidy, grant, budgetary support and generation-based incentives are netted off capital cost and tariff; the normative debt-equity structure and treatment of excess equity; loan tenor, the interest-rate benchmark and repayment mechanics; the depreciation method and value base; return on equity and its tax gross-up; working-capital components and interest; O&M expense norms and escalation; treatment of taxes and duties; payment rebate and late payment surcharge; and a ceiling-norms clause letting licensees and generators agree better norms (pp2–8).
Regulation 5 inserts Part-III of Chapter V (regulations 33-B to 39-BB, pp8–12), dealing only with small hydro up to 25 MW: capacity categorisation bands, normative capital cost per MW, the basis for normative saleable energy at the interconnection point, the free power structure and the formula for adjusting tariff where free power differs, auxiliary consumption and transformation losses, project-line energy losses, normative O&M expenses by band, and rounding of fractional capacity.
Regulation 3 widens the obligation in regulation 13 keyed to the "zero date", adding fixation or revision of the scheduled commissioning date, issue of certificates and supply of information needed under the regulations and the State Hydro Policy (p1). Regulation 6 makes consequential renumbering so existing cross-references in the 2017 regulations point to the new Part structure (p12).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.