Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fourth Amendment) Regulations, 2020

AmendmentDated 8 Sep 2020In force from 1 Apr 2020No. HPERC/428. dated 08th September, 2020

Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to Himachal Pradesh's 2017 renewable-energy tariff regulations. It was notified by HPERC on 8 September 2020 but is expressed to come into force from 1 April 2020, so it applies retrospectively for the intervening months (p1). Its main work is to open and populate the third control period for RE tariffs, which regulation 9(1) is amended to define as running from 1 April 2020 to 30 September 2023 (p1).

Regulation 4 inserts a new Part-III into Chapter IV (regulations 21-B to 32-BB, pp2–8), which fixes how tariffs for that window are computed. It covers what the capital cost norm includes and what is excluded from it; how central and state subsidy, grant, budgetary support and generation-based incentives are netted off capital cost and tariff; the normative debt-equity structure and treatment of excess equity; loan tenor, the interest-rate benchmark and repayment mechanics; the depreciation method and value base; return on equity and its tax gross-up; working-capital components and interest; O&M expense norms and escalation; treatment of taxes and duties; payment rebate and late payment surcharge; and a ceiling-norms clause letting licensees and generators agree better norms (pp2–8).

Regulation 5 inserts Part-III of Chapter V (regulations 33-B to 39-BB, pp8–12), dealing only with small hydro up to 25 MW: capacity categorisation bands, normative capital cost per MW, the basis for normative saleable energy at the interconnection point, the free power structure and the formula for adjusting tariff where free power differs, auxiliary consumption and transformation losses, project-line energy losses, normative O&M expenses by band, and rounding of fractional capacity.

Regulation 3 widens the obligation in regulation 13 keyed to the "zero date", adding fixation or revision of the scheduled commissioning date, issue of certificates and supply of information needed under the regulations and the State Hydro Policy (p1). Regulation 6 makes consequential renumbering so existing cross-references in the 2017 regulations point to the new Part structure (p12).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document