HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Seventh Amendment), Regulations, 2023.
OrderDated 22 Sep 2023
Read with the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The HPERC order dated 22.09.2023 (p1) finalises the draft Seventh Amendment to its 2017 RE tariff regulations. It records that the 3rd control period ends on 30.09.2023, so the Commission must fix the next control period and revise financial and technical parameters (p1). The draft was issued on 20.07.2023, gazetted on 21.07.2023, public-noticed on 27.07.2023, comments closed on 22.08.2023, and a public hearing was held on 04.09.2023 (p1–2). Pages 2–4 summarise stakeholder objections on capital cost, O&M, return on equity, CUF, subsidy treatment, water cess, payment security, free power, force majeure, line losses and PPA issues.
Pages 5–9 deal with preliminary legal objections: the Commission rejects arguments that the amendment violates Electricity Act s.3/181(3), that being 'guided' by CERC is binding, that the s.64 process must apply, and that s.181 does not allow amendment (p5–9). Pages 9–24 give regulation-wise analysis. The order retains the draft on tariff option/control period (Reg 13), subsidy adjustment (22-C), depreciation norms (25-C), O&M escalation (28-C/39-C) with a special protection for 5 MW and marginal higher SHP capacity, CUF (35-C), the free-power pass-through cap (36-C), and auxiliary consumption/loss norms (37-C/38-C). It accepts some changes: modifies Regulation 26-C on return on equity; inserts Regulation 29-CC for monthly reimbursement of water cess; deletes a provision in draft Regulation 31-CC on losing late payment surcharge; and specifies normative capital cost categories for SHPs (p12, p14–20). Pages 24–27 address miscellaneous issues, including hydro projects above 25 MW, and conclude by directing that the Seventh Amendment Regulations, 2023 be issued (p26–27). Annexure-A lists public hearing participants (p28).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.