HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination), Regulations, 2017.
Statement of reasonsDated 15 Nov 2017
The commission's reasons for the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 or one of its amendments.
Summary
Summary written by software, from pages 1 to 25 of 41. Check the regulator's original before you rely on it.
This is HPERC's Statement of Reasons recording how it consulted on, and reasoned through the objections to, its draft (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017. Pages 1–2 set out the background: the draft was published on 19.08.2017, noticed in two newspapers on 20.08.2017 with 21 days for objections, followed by a first public hearing on 16.09.2017, fresh notices on 20.09.2017, an extended deadline of 29.09.2017 and a second hearing on 07.10.2017. Eighteen stakeholders are listed as having commented, with Annexure 'A' holding the hearing participants (p2); their oral objections are summarised at pp2–3.
Pages 4–6 carry the general positions — developers pressing for stronger promotion of small hydro, the State Government's advice on green-energy development, and the Commission's stated commitment to a balanced approach in which inefficiencies are not rewarded. From para 3.3 onward the document works issue by issue, each with developers' comments, inputs from the Directorate of Energy, HPSEBL and the State Government, and the Commission's view.
Key conclusions recorded: the new regulations will commence 01.10.2017, not 01.04.2017, because the 2012 control period was extended to 30.09.2017 (p7); responsibility for the project line and interconnection facilities stays with the developer and forms part of capital cost (pp8–9); connectivity timelines and the 'may/shall' wording are retained (pp9–10); the Commission declines to clone CERC RE Regulations 2017 norms, rejecting the discrimination argument (pp11–12); it refuses to direct HPSEBL to purchase all SHP power (pp12–16); competitive bidding under s.63 remains outside these regulations (p16); tariff linkage to the IA date is retained but the cut-off is revised from 31.03.2017 to 31.12.2014 (pp19–24); annual revision of the generic tariff is rejected (p18); and the 40-year tariff period and discount-factor provisions stand (pp24–25).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.