HPERC · Himachal Pradesh Electricity Regulatory Commission

Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Second Amendment) Regulations, 2018

Draft amendmentDated 1 Aug 2018No. HPERC/428. dated 1st August, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation document rather than a finished instrument: the Himachal Pradesh Electricity Regulatory Commission published, at Shimla on 1 August 2018, the draft of the Second Amendment to its 2017 RE Tariff Regulations and invited objections and suggestions within twenty-one days of Rajpatra publication (pp1-2). The preamble records that the State Government amended the Hydro Power Policy, 2006 by notification dated 15.05.2018 and advised the Commission under section 108 of the Electricity Act, 2003 to change regulation 11 so that all small hydro developers can sign PPAs (p1).

The draft clauses then rework the 2017 Regulations. Draft regulation 2 deletes their sunset date so they run until reviewed, amended or repealed; draft regulation 3 replaces the control-period definition and adds definitions of Government Designated Agency, Scheduled COD and zero date (p2). Draft regulations 4 to 6 widen applicability to agreements including under the REC mechanism, provide for certification of the zero date and in-principle approval of sale to the distribution licensee, and set out how control periods are fixed, with the first small hydro control period running 1 October 2017 to 31 March 2020 (p3). Draft regulation 7 omits regulation 11 outright (p3).

The tariff machinery is then rebuilt: a substituted clause links the applicable generic levellised tariff to the control period in which scheduled or actual COD falls (p4); regulation 14 is replaced with a fuller provision on what the Commission specifies or fixes, when tariffs must be determined, and which existing norms and tariffs are preserved (pp4-5); and a new regulation 14-A governs how scheduled COD is computed from the certified zero date, when and how far it may be extended, and how the Commission assesses delay (pp5-6). Later clauses strip out regulation 11 cross-references and rework enhanced-capacity PPAs (p7), insert a proviso allowing the free-power ceiling to be relaxed where recovery is deferred (p8), and retitle Chapters IV and V with their applicability period stated (p8).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document