Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fifth Amendment) Regulations, 2020

AmendmentDated 20 Nov 2020No. HPERC/428. dated 20th November, 2020

Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission's Fifth Amendment to its 2017 renewable-energy tariff regulations was issued at Shimla on 20 November 2020 (p1) and comes into force on publication in the State Rajpatra; the gazette date is not printed. It is a short, single-purpose instrument: it lifts small hydro projects of up to and including 100 kW out of the standard technology-specific parameter regime and routes them instead to tariff fixed by separate Commission order.

Regulation 2 removes the entry in Regulation 3(2)(ii) of the 2017 Regulations that had reserved sub-100 kW small hydro for a separate tariff order (p1). Regulation 3 inserts a first proviso to Regulation 14(2) allowing the Commission to determine a Generic Levellised Tariff for such projects for the balance of the third control period ending 30.09.2023, using the Chapter-IV financial parameters together with technology-specific parameters it fixes in the tariff determination order, and renumbers the existing first proviso as a further proviso (p1–2).

Regulations 4 to 6 make consequential changes in Regulations 15, 21-B and 28-B so that parameter sources, norms and tariff treatment for small hydro above 100 kW continue on the general footing, while the sub-100 kW class is governed by orders under Regulation 14 (p2). Regulation 7 retitles Part III of Chapter V to cover small hydro above 100 kW, aligns Regulation 33-B, and adds a new Regulation 39-BBB whose operative text is largely missing from the scanned page (pp2–3).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document