HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fourth Amendment), Regulations, 2020.
OrderDated 8 Sep 2020Published in the Gazette 1 Apr 2020
Made under the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software, from pages 1 to 30 of 34. Check the regulator's original before you rely on it.
HPERC order finalising the Fourth Amendment to its 2017 RE Tariff Regulations. Pages 1–5 set the background: the principal RE Tariff Regulations, 2017 were published in the Rajpatra on 23 November 2017 and amended in 2018 and 2019; the second control period ended on 31.03.2020; a draft fourth amendment was issued on 23.03.2020 and revised after CERC notified its RE Tariff Regulations, 2020 on 23.06.2020; public objections and a video public hearing on 11.08.2020 are recorded (p1–5).
Pages 6–11 address legal and jurisdictional objections from developers. These include whether tariff/control-period provisions can run beyond five years, whether the Commission has power to amend regulations, whether the 2017 regulations lapsed after 31.03.2020, consistency with CERC and the National Tariff Policy, the meaning of “guided” in section 61, and use of commercial principles. The Commission rejects most objections, says the 2017 regulations continue in force, and treats CERC norms as persuasive rather than binding (p6–11).
Pages 11–26 are the core regulation-by-regulation analysis of the draft Fourth Amendment. The Commission decides on the third control period, capital cost, subsidy, debt-equity, loan and finance charges, depreciation, return on equity, working-capital interest, O&M, taxes and duties, rebate, late payment surcharge, ceiling norms, categorisation, normative capital cost, saleable energy/CUF, free power, auxiliary and transformation losses, interconnection losses, and O&M expenses (p11–26). Most draft provisions are retained; a few texts are modified for consistency and computation (p12, p14–16, p25).
Pages 26–30 deal with general issues outside the amendment’s subject matter: finalisation urgency, REC residual tariff, COD-linked tariff, O&M charges of bays, bay costs, and Model PPA disagreements. The Commission declines changes on Regulation 16(1)(b), PPA reopening and bay costs, while indicating future redrafting of the Model PPA and separate consideration of bay O&M (p26–30).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.