Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order

In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fourth Amendment), Regulations, 2020.

OrderDated 8 Sep 2020Published in the Gazette 1 Apr 2020

Made under the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 30 of 34. Check the regulator's original before you rely on it.

HPERC order finalising the Fourth Amendment to its 2017 RE Tariff Regulations. Pages 1–5 set the background: the principal RE Tariff Regulations, 2017 were published in the Rajpatra on 23 November 2017 and amended in 2018 and 2019; the second control period ended on 31.03.2020; a draft fourth amendment was issued on 23.03.2020 and revised after CERC notified its RE Tariff Regulations, 2020 on 23.06.2020; public objections and a video public hearing on 11.08.2020 are recorded (p1–5).

Pages 6–11 address legal and jurisdictional objections from developers. These include whether tariff/control-period provisions can run beyond five years, whether the Commission has power to amend regulations, whether the 2017 regulations lapsed after 31.03.2020, consistency with CERC and the National Tariff Policy, the meaning of “guided” in section 61, and use of commercial principles. The Commission rejects most objections, says the 2017 regulations continue in force, and treats CERC norms as persuasive rather than binding (p6–11).

Pages 11–26 are the core regulation-by-regulation analysis of the draft Fourth Amendment. The Commission decides on the third control period, capital cost, subsidy, debt-equity, loan and finance charges, depreciation, return on equity, working-capital interest, O&M, taxes and duties, rebate, late payment surcharge, ceiling norms, categorisation, normative capital cost, saleable energy/CUF, free power, auxiliary and transformation losses, interconnection losses, and O&M expenses (p11–26). Most draft provisions are retained; a few texts are modified for consistency and computation (p12, p14–16, p25).

Pages 26–30 deal with general issues outside the amendment’s subject matter: finalisation urgency, REC residual tariff, COD-linked tariff, O&M charges of bays, bay costs, and Model PPA disagreements. The Commission declines changes on Regulation 16(1)(b), PPA reopening and bay costs, while indicating future redrafting of the Model PPA and separate consideration of bay O&M (p26–30).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document