Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (First Amendment) Regulations, 2018

Draft amendmentDated 29 Mar 2018No. HPERC/428. dated 29th March, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's Shimla notification No. HPERC/428 dated 29 March 2018, which publishes draft First Amendment Regulations to the Commission's 2017 renewable-energy tariff regulations and invites objections and suggestions (p1–2). The preamble sets out the reason: the 2017 Regulations are stated to remain in force up to 31 March 2020, with the control period for small hydro projects (SHPs) ending on the same date, but the State Government's Department of MPP & Power wrote on 12.02.2018 asking the Commission to pend the tariff determination process or start it de novo while the State re-examines its Power Policy, 2006 in light of grievances raised by the Bonafide Himachali Power Producers Association (p1). Rather than wait, the Commission proposes to cut short the period of applicability and the control period so that stakeholders get an early indication of when new regulations, framed after the amended or new hydro policy, will take over (p1).

The draft text itself is short (p2). Clause 1 gives the short title and provides for commencement on publication in the Rajpatra. Clause 2 substitutes the existing end-date in Regulation 1(2) of the 2017 Regulations, and clause 3 makes the identical substitution in Regulation 9(1), in both cases replacing the 2020 date with a formula tied to the earlier of a 2019 date or the commencement of new renewable-energy regulations framed by the Commission. The draft is published under s.181(3) of the Electricity Act 2003 and rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005, will be taken into consideration after thirty days from Gazette publication, and is available on the Commission's website, with objections to be sent to the Secretary at Kasumpti, Shimla (p2).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document