HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Third Amendment), Regulations, 2019.
OrderDated 11 Nov 2019Published in the Gazette 23 Nov 2017
Made under the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software, from pages 1 to 30 of 38. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's order finalising the Third Amendment to its 2017 RE Tariff Regulations, which govern generic levellised tariffs for renewable energy projects, especially small hydro projects (SHPs) up to 25 MW. Pages 1–3 set out the background: the 2017 Regulations (gazette 23.11.2017), two earlier amendments (05.07.2018, 28.01.2019), the first control period's outer date of 30.09.2019, the draft third amendment notified on 31.07.2019 and published on 03.08.2019, and the public consultation including a hearing on 12.09.2019. Pages 3–5 summarise stakeholder objections — CERC parity, CUF, O&M, depreciation, control-period duration, and tariff linkage to COD. Pages 5–9 record the Commission's rejection of the legal challenge that it cannot amend the 2017 Regulations or regulate beyond 31.03.2020, and its treatment of the State Government's section 108 advice: it accepts advice on non-tariff matters but says tariff fixation is its own legislative function. Pages 9–17 deal regulation by regulation: it fixes the second control period at six months from 01.10.2019 to 31.03.2020, rewrites Regulation 13(1) on tariff applicability based on the scheduled/revised date of commencement of operation, amends Regulation 16 for SHP sales after the REC mechanism, adds a proviso to Regulation 14(4), and drops the proposed Regulation 16A on switching the mode of sale. Pages 17–21 cover Chapter IV financial principles — capital cost, subsidy/incentive adjustment, depreciation, return on equity, interest on working capital, O&M, taxes and duties, rebate, late payment surcharge and ceiling norms. Pages 21–24 address generic issues on CERC alignment, consumer burden and state-specific parameters. Pages 24–30 set technology-specific parameters for SHPs — categorisation, normative capital cost, saleable energy/CUF, free power, auxiliary consumption, energy losses and O&M expenses. The order ends by starting miscellaneous issues, including the definition of COD (p30).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.