Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order

In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Third Amendment), Regulations, 2019.

OrderDated 11 Nov 2019Published in the Gazette 23 Nov 2017

Made under the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 30 of 38. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's order finalising the Third Amendment to its 2017 RE Tariff Regulations, which govern generic levellised tariffs for renewable energy projects, especially small hydro projects (SHPs) up to 25 MW. Pages 1–3 set out the background: the 2017 Regulations (gazette 23.11.2017), two earlier amendments (05.07.2018, 28.01.2019), the first control period's outer date of 30.09.2019, the draft third amendment notified on 31.07.2019 and published on 03.08.2019, and the public consultation including a hearing on 12.09.2019. Pages 3–5 summarise stakeholder objections — CERC parity, CUF, O&M, depreciation, control-period duration, and tariff linkage to COD. Pages 5–9 record the Commission's rejection of the legal challenge that it cannot amend the 2017 Regulations or regulate beyond 31.03.2020, and its treatment of the State Government's section 108 advice: it accepts advice on non-tariff matters but says tariff fixation is its own legislative function. Pages 9–17 deal regulation by regulation: it fixes the second control period at six months from 01.10.2019 to 31.03.2020, rewrites Regulation 13(1) on tariff applicability based on the scheduled/revised date of commencement of operation, amends Regulation 16 for SHP sales after the REC mechanism, adds a proviso to Regulation 14(4), and drops the proposed Regulation 16A on switching the mode of sale. Pages 17–21 cover Chapter IV financial principles — capital cost, subsidy/incentive adjustment, depreciation, return on equity, interest on working capital, O&M, taxes and duties, rebate, late payment surcharge and ceiling norms. Pages 21–24 address generic issues on CERC alignment, consumer burden and state-specific parameters. Pages 24–30 set technology-specific parameters for SHPs — categorisation, normative capital cost, saleable energy/CUF, free power, auxiliary consumption, energy losses and O&M expenses. The order ends by starting miscellaneous issues, including the definition of COD (p30).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document