Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fifth Amendment) Regulations, 2020

Draft amendmentDated 6 Oct 2020No. HPERC/428 dated 6th October, 2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's draft Fifth Amendment to its 2017 renewable-energy tariff regulations, issued at Shimla on 6 October 2020 as No. HPERC/428 and published for the objections-and-suggestions procedure required before a regulation is made (p1). The recitals explain the trigger: the state's Micro Hydel Projects Policy of 2012 barred sale to HPSEBL; a state amendment of 23 August 2017 allowed HPSEBL to buy from projects up to 100 kW where there is no captive or third-party sale; HIMURJA had allotted 55 projects, and developers and HIMURJA asked the Commission for a generic levellised tariff for such micro hydel projects (p1).

The operative draft sits in seven clauses (pp2–3). It removes small hydro up to 100 kW from the technology entry in Regulation 3(2)(ii); adds a proviso to Regulation 14(2) letting the Commission determine a generic levellised tariff for those projects for the balance of the third control period, using the Chapter IV financial parameters and technology-specific parameters fixed in the tariff order; adjusts Regulations 15(1)(ii) and (iii) and 21-B(1) so those projects follow the tariff and norms fixed in orders under Regulation 14 instead of Chapter V; and confines the Chapter V technology-specific parameters and O&M norms to small hydro above 100 kW, with a new Regulation 39-BBB saying so expressly (pp2–3). Regulation 28-B(2) is reworded to the same 100 kW dividing line (p3).

Objections are due within thirty days of publication in the Rajpatra, and objections not relevant to the proposed amendment will not be considered (pp1–2). The regulations commence on the date of Rajpatra publication, which the document does not print (p2).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document