HPERC · Himachal Pradesh Electricity Regulatory Commission

Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Sixth Amendment) Regulations, 2023

AmendmentDated 27 Jan 2023In force from 3 Jun 2022No. HPERC/428. dated the 27th January, 2023

Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the HPERC's Sixth Amendment to its 2017 RE Tariff Regulations, issued as notification No. HPERC/428 from Shimla on 27 January 2023 (p1). The recitals set out the trigger: Regulation 31-B of the 2017 regulations carried the Commission's own late payment surcharge mechanism, and the Ministry of Power's Electricity (Late Payment Surcharge and Related Matters) Rules, 2022 — gazetted 3 June 2022 — together with two MoP clarifications of August and September 2022 stating that the central Rules prevail over conflicting state regulations, made alignment necessary (p1).

Regulation 1 gives the title, reach and commencement: the amendment applies only to Power Purchase Agreements approved by the Commission on or after 3rd June, 2022 and is deemed to have come into force from that date, so its effect is retrospective but confined by PPA vintage (p1–2). Regulation 2 inserts five new definitions into Regulation 2(1) of the 2017 regulations — base rate of late payment surcharge, default trigger date, due date, outstanding dues and payment security mechanism (p2).

Regulation 3 substitutes Regulation 31-B wholesale, replacing the earlier LPS mechanism with a priority-payment duty on the distribution licensee, a base-rate LPS that escalates month by month up to a cap for continuing default, separate rate computation where a default spans two financial years, and a payment-appropriation waterfall that time-tags bills and applies receipts to LPS first and then to the oldest unpaid bill (p3).

Regulation 4 inserts a new Regulation 31-BB on payment security. The licensee must maintain adequate, unconditional and irrevocable security, and power is to be supplied only against security or advance payment, failing which the generator forfeits its LPS claim. On default past the trigger date the generator's supply obligation to the licensee is cut, with the freed capacity sellable on power exchanges, rising to the whole contracted capacity if default persists; gains and losses on such sales are computed against Green Day Ahead Market prices and shared between licensee and generator after liquidation of overdue amounts (p3–4).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Late payment surcharge and rebate, Payment security

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document