HPERC · Himachal Pradesh Electricity Regulatory Commission
RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Third Amendment) Regulations, 2019
Draft amendmentDated 31 Jul 2019No. HPERC/428. dated 31st July, 2019
Draft
A proposal that has since been finalised as the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission published this draft on 31 July 2019 as the Third Amendment to its 2017 RE Tariff Regulations (p1). It is a consultation document: the amendment is to be taken up after 21 days from publication in the Rajpatra, a public hearing is fixed for 29 August 2019, and the draft regulations are to come into force on 1 October 2019 (p1–2). The stated trigger is the expiry of the current control period on 30 September 2019 and the need to fix a new control period and revise financial and technical parameters (p1).
Clauses 1–9 (p2–3) amend the parent regulations. They widen the opening exclusion in regulation 3, substitute the residual-tariff clause in regulation 8, insert a second control period for small hydro projects running from 1 October 2019 to 30 September 2020, and insert a new regulation 16A, which lets an SHP developer that first sold power through open access, a short-term agreement or the REC mechanism later sign a long-term power purchase agreement for the residual useful life at the generic tariff of the control period in which the earlier arrangement was signed or the plant started operating (p2–3). Consequential changes run through regulations 9, 13, 14, 16 and 18.
Chapter IV (p4–9) is new and applies to all renewable technologies for the second control period: capital cost and its exclusions, treatment of subsidy, grants and generation-based incentives, the debt-equity ratio and treatment of excess equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, taxes and duties, payment terms (due date, rebate, late payment surcharge) and the ceiling-norm principle that lets the parties agree better terms. Regulation 32A makes the chapter applicable across the second control period irrespective of when generic tariffs for a technology are determined.
Chapter V (p9–13) is SHP-specific: capacity categories, normative capital cost, the build-up of normative saleable energy (CUF, auxiliary and transformation losses, project-line losses, free power), the free-power framework and the formula for adjusting tariffs when free power differs, loss norms, O&M norms and rounding of installed capacity.
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.