HPERC · Himachal Pradesh Electricity Regulatory Commission

RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Third Amendment) Regulations, 2019

Draft amendmentDated 31 Jul 2019No. HPERC/428. dated 31st July, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission published this draft on 31 July 2019 as the Third Amendment to its 2017 RE Tariff Regulations (p1). It is a consultation document: the amendment is to be taken up after 21 days from publication in the Rajpatra, a public hearing is fixed for 29 August 2019, and the draft regulations are to come into force on 1 October 2019 (p1–2). The stated trigger is the expiry of the current control period on 30 September 2019 and the need to fix a new control period and revise financial and technical parameters (p1).

Clauses 1–9 (p2–3) amend the parent regulations. They widen the opening exclusion in regulation 3, substitute the residual-tariff clause in regulation 8, insert a second control period for small hydro projects running from 1 October 2019 to 30 September 2020, and insert a new regulation 16A, which lets an SHP developer that first sold power through open access, a short-term agreement or the REC mechanism later sign a long-term power purchase agreement for the residual useful life at the generic tariff of the control period in which the earlier arrangement was signed or the plant started operating (p2–3). Consequential changes run through regulations 9, 13, 14, 16 and 18.

Chapter IV (p4–9) is new and applies to all renewable technologies for the second control period: capital cost and its exclusions, treatment of subsidy, grants and generation-based incentives, the debt-equity ratio and treatment of excess equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, taxes and duties, payment terms (due date, rebate, late payment surcharge) and the ceiling-norm principle that lets the parties agree better terms. Regulation 32A makes the chapter applicable across the second control period irrespective of when generic tariffs for a technology are determined.

Chapter V (p9–13) is SHP-specific: capacity categories, normative capital cost, the build-up of normative saleable energy (CUF, auxiliary and transformation losses, project-line losses, free power), the free-power framework and the formula for adjusting tariffs when free power differs, loss norms, O&M norms and rounding of installed capacity.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Return, financing and working capital

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗