HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
In the matter of draft amendment Regulations of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (First Amendment) Regulations, 2018.
OrderDated 7 May 2018Published in the Gazette 31 Mar 2018
Read with the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's two-page order (p1–2) finalises the draft First Amendment to its 2017 renewable-energy tariff regulations and clears it for notification. The Commission records that the RE Tariff Regulations, 2017 — published in the Rajpatra on 23 November 2017 — were to remain in force only up to 31 March 2020, with the control period for small hydro projects ending on the same date (p1).
The trigger is a State Government request: the Department of MPP & Power, by letter dated 12 February 2018, said it intended to re-examine the State Power Policy, 2006 after grievances raised by the Bonafide Himachali Power Producers Association at a meeting on 9 February 2018, and asked the Commission to pend tariff determination or start de novo (p1). Rather than proceed, the Commission decided to restrict the period of applicability and the control period of the 2017 regulations so that fresh regulations can be framed after the State's amended/new hydro policy is in place (p1).
The order then documents the consultation: the draft amendment was notified on 29 March 2018 and gazetted on 31 March 2018 under s.181(1) of the Electricity Act, 2003; objections were invited through newspaper notices on 6 April 2018 under the Electricity (Procedure of Previous Publication) Rules, 2005; major stakeholders were asked for comments by letter on 7 April 2018; HPPCL replied that its suggestions were nil and no other comments arrived (p2). The draft is therefore approved unchanged for notification, dated Shimla, 7 May 2018 (p2).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.