HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Second Amendment) Regulations, 2019
AmendmentDated 28 Jan 2019No. HPERC/428 dated 28th January, 2019
Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. A state amendment regulation issued by the Himachal Pradesh Electricity Regulatory Commission at Shimla on 28 January 2019 (No. HPERC/428) (p1). It rewrites parts of the HPERC (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017. It takes effect from publication in the Rajpatra, Himachal Pradesh; that Gazette date is not printed (p1).
Removing the sunset. Regulation 2 deletes the clause that would have made the 2017 regulations lapse on 31 March 2019 or on commencement of successor RE regulations, replacing it with an open-ended "until reviewed, amended and repealed by the Commission" formula (p1).
Definitions and scope. Regulation 3 redefines "control period or review period", broadens "date of commencement of operation" to cover COD, and inserts a State-Government "Government Designated Agency" to certify zero dates along with a "zero date" definition pegged to the State Hydro Policy (p1–2). Regulation 4 widens the applicability clause to cover PPAs under the REC mechanism and other disposal arrangements, restricts the relevant clause to Small Hydro Projects, and adds a category of projects already operating before these amendments (p2).
PPAs and control periods. Regulation 5 lets a distribution licensee grant in-principle approval for purchase of power within the State Hydro Policy framework, with an outer validity date, automatic lapse and a Commission extension route; approvals already issued on or before 11.02.2019 must be re-fixed (p2–3). Regulation 6 makes the Commission fix control-period durations, with the first SHP control period running 1 October 2017 – 30 September 2019 (p3). Regulation 7 omits regulation 11; regulation 8 recasts the SHP tariff route around the control period in which the joint PPA petition is filed and the designated-agency certificate (p3–4). Regulation 9 substitutes regulation 14, the generic levellised tariff machinery — financial norms, technology-specific parameters, a 90-day determination timeline, and tariffs that are normative with no true-up (p4–5).
Transitional and chapter changes. Regulation 12 rewrites regulation 17 to allocate original, additional and enhanced SHP capacity between the 2012 and 2017 regulations and to build a composite rate for enhanced capacity, including free-power treatment (p6–10). Regulations 14–15 retitle Chapters IV and V as financial principles and SHP technology-specific parameters, applicable 01.10.2017–30.09.2019 (p10).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.