Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Seventh Amendment) Regulations, 2023

Draft amendmentDated 20 Jul 2023No. HPERC/428. dated 20th July 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification No. HPERC/428, dated 20 July 2023, publishes for public objection a draft Seventh Amendment to the Commission's 2017 regulations on promoting renewable generation and determining RE tariffs (p1). It is a consultation document: the draft will be taken up only after thirty days from publication in the Rajpatra, Himachal Pradesh, and objections go to the Secretary at Kasumpti (p1). The draft amendment itself would come into force on 1 October 2023 (p1).

The operative clauses begin by rewriting three definitions in Regulation 2 — when a project's operation commences, what installed capacity means (with a separate AC-based rule for solar PV and floating solar), and what the REC mechanism refers to (p1–2). Two provisos then fix a new fourth control period for small hydro projects, running 1 October 2023 to 31 March 2027, and give a tariff rule for small hydro projects admitted under the State Government's One Time Amnesty Scheme (p2).

The bulk of the draft inserts a new PART-IV into Chapter IV as "Financial Principles" (p3–10). It covers the capital-cost base and its exclusions, how subsidy, grant and incentive are netted off, the debt-equity ratio, loan tenure, interest benchmarking, depreciation, return on equity, working capital, O&M expenses, taxes, rebate and due dates. It also builds a payment-discipline regime: late payment surcharge with escalating rates and a payment-ordering rule, and a payment security mechanism under which supply obligations step down and diverted power is sold on power exchanges, with gains or losses shared (p8–10). Financial norms other than capital cost are ceilings (p10).

A second new PART-IV is inserted into Chapter V for small hydro projects above 100 kW (p10–14): capacity bands, normative capital cost, normative saleable energy after free power and losses, a free-power adjustment formula and cap, auxiliary, transformation and project-line loss norms, O&M norms and an installed-capacity rounding rule. Projects up to 100 kW are left to orders under Regulation 14 (p3, p14). A final table makes consequential substitutions of cross-references across the 2017 Regulations (p14–15).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document