Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Seventh Amendment) Regulations, 2023
Draft amendmentDated 20 Jul 2023No. HPERC/428. dated 20th July 2023
Draft
A proposal that has since been finalised as the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's notification No. HPERC/428, dated 20 July 2023, publishes for public objection a draft Seventh Amendment to the Commission's 2017 regulations on promoting renewable generation and determining RE tariffs (p1). It is a consultation document: the draft will be taken up only after thirty days from publication in the Rajpatra, Himachal Pradesh, and objections go to the Secretary at Kasumpti (p1). The draft amendment itself would come into force on 1 October 2023 (p1).
The operative clauses begin by rewriting three definitions in Regulation 2 — when a project's operation commences, what installed capacity means (with a separate AC-based rule for solar PV and floating solar), and what the REC mechanism refers to (p1–2). Two provisos then fix a new fourth control period for small hydro projects, running 1 October 2023 to 31 March 2027, and give a tariff rule for small hydro projects admitted under the State Government's One Time Amnesty Scheme (p2).
The bulk of the draft inserts a new PART-IV into Chapter IV as "Financial Principles" (p3–10). It covers the capital-cost base and its exclusions, how subsidy, grant and incentive are netted off, the debt-equity ratio, loan tenure, interest benchmarking, depreciation, return on equity, working capital, O&M expenses, taxes, rebate and due dates. It also builds a payment-discipline regime: late payment surcharge with escalating rates and a payment-ordering rule, and a payment security mechanism under which supply obligations step down and diverted power is sold on power exchanges, with gains or losses shared (p8–10). Financial norms other than capital cost are ceilings (p10).
A second new PART-IV is inserted into Chapter V for small hydro projects above 100 kW (p10–14): capacity bands, normative capital cost, normative saleable energy after free power and losses, a free-power adjustment formula and cap, auxiliary, transformation and project-line loss norms, O&M norms and an installed-capacity rounding rule. Projects up to 100 kW are left to orders under Regulation 14 (p3, p14). A final table makes consequential substitutions of cross-references across the 2017 Regulations (p14–15).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 22 Sep 2023Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.