Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Seventh Amendment) Regulations, 2023

AmendmentDated 22 Sep 2023In force from 1 Oct 2023No. HPERC/428. dated the 22nd September, 2023

Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission's 2017 RE tariff regulations. It was issued in Shimla on 22 September 2023 (p1) and comes into force on 1 October 2023 (p1). Its main work is to update definitions, reset the small-hydro control period, and insert new tariff-methodology Parts for the fourth control period running 01.10.2023–31.03.2027 (pp2–3, p10).

Regulation 2 amendments redefine when a project is treated as commencing operation, how installed capacity is measured, and what the REC mechanism means, tying it to the CERC REC Regulations, 2022 and the HPERC RPO Regulations, 2023 (pp1–2). Regulation 9 fixes the fourth control period for small hydro projects from 1 October 2023 to 31 March 2027 (p2). Regulation 13 adds a proviso for small hydro projects covered by the State's One Time Amnesty Scheme, requiring the generic levellised tariff for the control period covering the scheduled or actual commissioning date, whichever is earlier, without further schedule revision (p2).

Chapter IV gains a new Part-IV on financial principles (Regs 21-C to 32-CC, pp2–10). It specifies how capital cost is built up and what is excluded, how central/state subsidy, grant and GBI are adjusted in tariffs, debt-equity treatment, loan and finance charges, depreciation, return on equity, working capital and interest, O&M expenses and escalation, taxes, water-cess reimbursement for SHPs, rebate, late payment surcharge, payment security mechanism and default remedies, ceiling norms, and the application of the Part to all RE technologies for fourth-control-period matters (pp2–10).

Chapter V gains a new Part-IV with technology-specific parameters for small hydro projects above 100 kW (Regs 33-C to 39-CCC, pp10–14). It sets capacity categories, normative capital cost tables, normative saleable energy and CUF, free-power structure and adjustment formula, auxiliary/transformation losses, project-line losses, O&M norms, rounding of installed capacity, and states that SHPs up to 100 kW remain governed by orders under Regulation 14 (pp10–14).

Finally, a consequential amendment table updates existing cross-references to the new regulations and provides that certain existing provisions remain in force up to 31 March 2026 (pp14–15). The notification is signed by the Secretary of the Commission (p15).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.