HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Seventh Amendment) Regulations, 2023
AmendmentDated 22 Sep 2023In force from 1 Oct 2023No. HPERC/428. dated the 22nd September, 2023
Amends the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Seventh Amendment to the Himachal Pradesh Electricity Regulatory Commission's 2017 RE tariff regulations. It was issued in Shimla on 22 September 2023 (p1) and comes into force on 1 October 2023 (p1). Its main work is to update definitions, reset the small-hydro control period, and insert new tariff-methodology Parts for the fourth control period running 01.10.2023–31.03.2027 (pp2–3, p10).
Regulation 2 amendments redefine when a project is treated as commencing operation, how installed capacity is measured, and what the REC mechanism means, tying it to the CERC REC Regulations, 2022 and the HPERC RPO Regulations, 2023 (pp1–2). Regulation 9 fixes the fourth control period for small hydro projects from 1 October 2023 to 31 March 2027 (p2). Regulation 13 adds a proviso for small hydro projects covered by the State's One Time Amnesty Scheme, requiring the generic levellised tariff for the control period covering the scheduled or actual commissioning date, whichever is earlier, without further schedule revision (p2).
Chapter IV gains a new Part-IV on financial principles (Regs 21-C to 32-CC, pp2–10). It specifies how capital cost is built up and what is excluded, how central/state subsidy, grant and GBI are adjusted in tariffs, debt-equity treatment, loan and finance charges, depreciation, return on equity, working capital and interest, O&M expenses and escalation, taxes, water-cess reimbursement for SHPs, rebate, late payment surcharge, payment security mechanism and default remedies, ceiling norms, and the application of the Part to all RE technologies for fourth-control-period matters (pp2–10).
Chapter V gains a new Part-IV with technology-specific parameters for small hydro projects above 100 kW (Regs 33-C to 39-CCC, pp10–14). It sets capacity categories, normative capital cost tables, normative saleable energy and CUF, free-power structure and adjustment formula, auxiliary/transformation losses, project-line losses, O&M norms, rounding of installed capacity, and states that SHPs up to 100 kW remain governed by orders under Regulation 14 (pp10–14).
Finally, a consequential amendment table updates existing cross-references to the new regulations and provides that certain existing provisions remain in force up to 31 March 2026 (pp14–15). The notification is signed by the Secretary of the Commission (p15).
Read with this
The regulation
Amendments and corrections
- Dated 7 May 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination (First Amendment) Regulations, 2018
- Dated 28 Jan 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination (Second Amendment) Regulations, 2019
- Dated 11 Nov 2019Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Third Amendment, 2019
- Dated 8 Sep 2020Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020
- Dated 20 Nov 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Sixth Amendment, 2023
- Dated 24 Jun 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026
Commencement notices and reasons
- Dated 15 Nov 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Statement of Reasons
- Dated 7 May 2018Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Order
- Dated 19 Nov 2020RE Tariff Regulations, 2017 — Fifth Amendment, 2020 — Statement of Reasons
- Dated 27 Jan 2023Promotion of Generation from RE Sources and Tariff Determination (Sixth Amendment) Regulations, 2023 — Finalisation Order
- Dated 22 Sep 2023Promotion of Generation from RE Sources and Tariff Determination Regulations, 2017 — Seventh Amendment, 2023 — Finalisation Order
- Dated 23 Jun 2026RE Tariff Regulations, 2017 — Eighth Amendment, 2026 — Finalization Order
Procedures and orders made under it
- Dated 24 Jan 2019RE Tariff Regulations, 2017 — Second Amendment, 2019 — Order
- Dated 11 Nov 2019Promotion of Generation from RE Sources and Tariff Determination (Third Amendment) Regulations, 2019 — Order
- Dated 8 Sep 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Fourth Amendment, 2020 — Order
Earlier drafts
- Dated 11 Aug 2017Draft RE Tariff Regulations, 2017
- Dated 29 Mar 2018Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — First Amendment, 2018 — Draft
- Dated 1 Aug 2018Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Second Amendment) Regulations, 2018 — Draft
- Dated 31 Jul 2019RE Tariff Regulations, 2017 — Third Amendment, 2019 — Draft
- Dated 6 Oct 2020Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fifth Amendment) Regulations, 2020 — Draft
- Dated 28 Nov 2022RE Tariff Regulations, 2017 — Sixth Amendment, 2022 — Draft
- Dated 20 Jul 2023RE Tariff Regulations, 2017 — Seventh Amendment, 2023 — Draft
- Dated 20 Jul 2023Explanatory memorandum: Renewable Energy Tariff (Seventh Amendment) Regulations, 2023 — Draft Explanatory Memorandum
- Dated 12 May 2026Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017 — Eighth Amendment, 2026 — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.