Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Draft RE Tariff Regulations, 2017

Draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017.

Explanatory memorandum to a draftDated 11 Aug 2017

Explanatory memorandum to a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC has issued a consultation package for a new renewable-energy tariff framework. Pages 1-42 are an Explanatory Memorandum: it reviews Himachal Pradesh's small-hydro, solar, wind and biomass potential (pp2-6); sets out the statutory and policy basis in the Electricity Act 2003, National Electricity Policy, National Tariff Policy 2016, NAPCC and the RPO trajectory (pp2-9); describes State policies, including the Hydro Power Policy 2006 as amended, the Solar Power Policy 2016 and HPSEBL's renewable purchase policy (pp9-11); summarises CERC's RE Tariff Regulations 2017 as the main benchmark (pp11-13); and explains the proposed design choices - scope, control period, tariff period, tariff options, financial norms, SHP technology norms, free power, capacity enhancement and other parameters (pp13-42).

Page 43 is the Commission's notification publishing the draft Regulations for objections and suggestions within 21 days of Rajpatra publication. The draft Regulations then run chapter by chapter: Chapter I (regs 1-4) preliminary provisions, definitions, scope and eligibility; Chapter II (regs 5-7) promotion of RE generation, connectivity, joint evacuation and coordination committee; Chapter III (regs 8-20) general tariff principles - PPA process, control period, tariff period, special provisions for SHPs, tariff design, generic and project-specific options, capacity enhancement, REC residual-period tariff, non-SHP technologies, project-specific petition process and review of tariff; Chapter IV (regs 21-32) financial principles - capital cost, subsidy, debt-equity, loans, depreciation, return on equity, working capital, O&M, taxes, rebate, late payment and ceiling norms; Chapter V (regs 33-39) SHP categorisation and technology-specific norms; Chapter VI (regs 40-41) CDM benefit sharing and tariff for lower or higher generation; Chapter VII (regs 42-45) deviations, overriding effect, removal of difficulties and power to relax.

Eligibility is defined by RE technology, with small hydro capped at 25 MW at a single location; projects up to 100 kW and projects already tied up by long-term agreement or procured through competitive bidding are outside the draft (pp47-48). The draft would come into force on 1 October 2017 and remain in force until 31 March 2020 unless reviewed earlier or extended (p43, p52). It retains the 2012 RE framework for SHPs whose first Implementation Agreement was executed on or before 31 March 2017 and whose PPA was not approved before commencement, subject to provisos (pp20-21, pp53-54).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Return, financing and working capital

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document