GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
Draft Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (First Amendment) Regulations, 2016
Explanatory memorandum to a draftDated 28 Sep 2016
Draft
The draft has since been finalised as the Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016.
Explanatory memorandum to the Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is an explanatory memorandum issued by the Gujarat Electricity Regulatory Commission for draft amendments to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 (p1). It records that the 2015 principal regulations were notified on 24 September 2015, taking reference from the Forum of Regulators' Model Supply Code, and that a Supply Code Review Panel under Clause 1.1 considered proposals from distribution utilities, consumers and consumer organisations before recommending amendments to the Commission (p1).
The memorandum then lists nine proposed changes. On p1, it proposes accepting a Municipal Demand Notice as proof of residence where municipal tax receipts lack detail; allowing consumers to pay dishonoured-cheque dues through RTGF/NEFT as well as cash; and replacing the words 'direct theft' with 'theft' in the relevant clause. On p2, it proposes making pasting of an inspection report at a conspicuous place discretionary ('may be pasted') rather than mandatory; correcting a typographical error in clause 8.5; revising load factors for assessing energy in theft/unauthorised-use cases, including separate treatment for agriculture metered consumers on agriculture-dominant and other feeders and a rationalised factor for direct theft; creating a separate priority window at collection centres for senior citizens, physically challenged persons and women; and empowering licensees to act under the Electricity Act for default in payment of assessed amounts under Section 135 instead of only approaching Special Courts.
The document gives reasons and recommendations, not the actual amended regulation text, commencement date or savings provisions (p1–2).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.